[00:00:07]

WELL, GOOD EVENING AND WELCOME TO THE JUNE 16TH, 2025 WORK SESSION FOR THE GARLAND CITY COUNCIL. AND YOU MAY NOTICE THAT WE ARE NOT IN THE WORK SESSION ROOM. WE ARE GOING TO GET AN UPDATE ON SOME TECHNOLOGY UPDATES WE'RE DOING HERE IN THE IN THE CHAMBER AND THE WORK SESSION ROOM. SO WE ARE MEETING IN THE COUNCIL CHAMBERS THIS EVENING. FIRST ITEM ON OUR AGENDA IS PUBLIC COMMENTS ON WORK SESSION ITEMS. I BELIEVE WE HAVE ONE SPEAKER TONIGHT.

MEMBERS OF THE AUDIENCE MAY ADDRESS THE CITY COUNCIL ON ANY WORK SESSION ITEM AT THE BEGINNING OF THE MEETING. SPEAKERS ARE ALLOWED THREE MINUTES, GROUPED BY AGENDA ITEM AND CALLED IN THE ORDER OF THE AGENDA. ANYONE WISHING TO SPEAK MUST FILL OUT A SPEAKER CARD AND GIVE IT TO THE CITY SECRETARY. I WILL CALL THE MEETING TO ORDER. SPEAKERS ARE LIMITED TO ADDRESSING ITEMS ON THE WORK SESSION AGENDA ONLY ITEMS ON THE REGULAR MEETING AGENDA SHOULD BE ADDRESSED AT THE RESPECTIVE MEETING. ITEMS NOT CURRENTLY ON AGENDA MAY BE ADDRESSED DURING THE CITIZEN COMMENT PORTION OF ANY REGULAR MEETING. MADAM SECRETARY, YOU CALL OUR FIRST SPEAKER. I DON'T THINK YOUR MIC IS ON. RANDY SMITH. MR. SMITH, IF YOU COME FORWARD, SIR. AND IF YOU CAN GIVE US YOUR NAME AND ADDRESS FOR THE RECORD, EXCUSE ME, AND YOU WILL HAVE THREE MINUTES AND THERE'S A TIMER IN FRONT OF YOU. THANK YOU, MR. MAYOR. CITY COUNCIL, APPRECIATE YOU BEING HERE. LET ME SPEAK IN FRONT OF YOU TONIGHT BEFORE I START. YOU KIND OF THREW ME CURVEBALL THERE. I'M NOT SPEAKING ON ANY AGENDA ITEM THAT IS ON. THAT IS BEFORE YOU TODAY.

THIS IS JUST BASICALLY CITIZEN'S COMMENT. THEN IT WILL NEED TO WAIT UNTIL TOMORROW NIGHT'S MEETING FOR THAT SECTION. YES. THAT'S NOT THE WAY IT WAS EXPLAINED TO ME WHEN I CALLED ABOUT THE MEETING HERE, BUT I APOLOGIZE FOR TAKING UP YOUR TIME AND I'LL YIELD BACK. WE'LL SEE YOU TOMORROW NIGHT THEN, SIR. MOVING ON TO OUR NEXT ITEM, CONSIDER THE CONSENT AGENDA.

[CONSIDER THE CONSENT AGENDA Council may ask for discussion or further information on any item posted in the consent agenda of the next Regular Meeting. Council may also ask that an item on the consent agenda be pulled and considered for a vote separate from the consent agenda at the next Regular Meeting. All discussions or deliberations are limited to posted agenda items and may not include new or unposted subject matter.]

THIS BE FOR TOMORROW NIGHT. I HAVEN'T SEEN ANY REQUESTS TO HAVE ANY ITEMS PULLED, BUT OBVIOUSLY, IF THERE IS A REQUEST, THE SOONER WE CAN HAVE IT, THE BETTER. SO WE CAN GET THE INFORMATION PREPARED. MOVING ON TO WRITTEN BRIEFINGS, FIRST ITEM UNDER THIS SECTION. ITEM

[1. Parking Restrictions on Wall Street Council is requested to consider parking restrictions on Wall Street. Unless otherwise directed by Council, this item will be scheduled for formal consideration at the July 8, 2025 Regular Meeting.]

ONE PARKING RESTRICTIONS ON WALL STREET. ITEM TWO NOTICE OF INTENTION TO ISSUE CERTIFICATES

[2. Notice of Intention to Issue Certificates of Obligation Council is requested to consider a resolution directing the publication of notice of intention to issue certificates of obligation to fund Capital Projects. Unless otherwise directed by Council, this item will be scheduled for formal consideration at the June 17, 2025 Regular Meeting.]

[3. Technology Update for the City Council Chambers and Work Session Rooms Staff will give a brief update on the new technology and system for agendas and audio-visual equipment.]

OF OBLIGATION. ALL RIGHT. THAT WILL MOVE US ON TO VERBAL BRIEFINGS. ITEM THREE TECHNOLOGY UPDATE FOR THE CITY COUNCIL CHAMBER AND WORK SESSION ROOM, MR. BETTS. THANK YOU MAYOR. GOOD EVENING. MAYOR AND COUNCIL. TONIGHT, AS YOU CAN SEE, IS THE FIRST NIGHT THAT WE HAVE THE NEW AV SYSTEM INSTALLED HERE IN THE COUNCIL CHAMBERS IN FRONT OF YOU, YOU'LL SEE NEW MICROPHONES.

THE MAYOR HAS A NEW CONTROL PANEL. YOU'LL HAVE A REQUEST TO SPEAK BUTTONS. AND WE'VE PROVIDED SOME TRAINING. THERE'S ALSO IPADS FOR INTERACTING WITH THE NEW AGENDA SOFTWARE AND NEW AGENDA SOFTWARE. THIS PROJECT HAS BEEN UNDERWAY FOR SEVERAL MONTHS NOW, AND WE TOOK THE OPPORTUNITY BETWEEN THE LAST COUNCIL MEETING AND THIS COUNCIL MEETING TO INSTALL THIS TECHNOLOGY IN THIS CHAMBERS. NORMALLY FOR A PROJECT SUCH AS THIS, WE WOULD HAVE SHUT DOWN THE COUNCIL CHAMBERS AND THE WORK SESSION ROOM AND MOVED OVER TO THE GOLDILOCK ROOM FOR A MONTH OR TWO. TO DO THAT. WE DECIDED FROM OUR PAST EXPERIENCE THAT THAT WOULD BE VERY DISRUPTIVE, BOTH FOR THE COUNCIL AND FOR THE PUBLIC WHO IS USED TO BEING HERE. AND THAT'S THE REASON WHY WE'RE IN THIS ROOM TONIGHT, BECAUSE THE TECHNOLOGY IN THIS ROOM IS MOSTLY DONE. THE TECHNOLOGY NEXT DOOR, WE'RE STILL COMPLETING OUT. IN THE COMING WEEKS, WE WILL COMPLETE ALL THE REST OF THE TECHNOLOGY IN THIS ROOM, AND WE WILL COMPLETE THE TECHNOLOGY IN THE ROOM NEXT DOOR. THERE'S ALSO NEW AGENDA SOFTWARE CIVIC CLERK, WHICH IS NOW IN PLACE, AND IT'S GOING TO REPLACE THE OLD AGENDA AND OLD VOTE LINKS VOTING SYSTEM TO GIVE US GREATER RELIABILITY, TRANSPARENCY AND PUBLIC ACCESS. BECAUSE THE SYSTEMS ARE BOTH NEW, WE WANT YOU TO KNOW THAT TONIGHT WE HAVE EXTRA STAFF HERE. IF AT ANY TIME DURING THE MEETING, YOU OR A MEMBER OF THE PUBLIC NEEDS ASSISTANCE WITH THE TECHNOLOGY. IF YOU JUST GET ONE OF OUR ATTENTIONS, WE'LL COME UP AND HELP YOU WITH THE TECHNOLOGY TO MAKE SURE THAT THE MEETING GOES ACCORDING TO PLAN. AND WITH THAT MAYOR, IF YOU HAVE ANY QUESTIONS ABOUT THE TECHNOLOGY AND THE SOFTWARE, I'D BE HAPPY TO ANSWER THEM. AND JUST SO EVERYBODY KNOWS, I DIDN'T SHUT THE TIMER OFF. AND THAT'S WHAT YOU JUST HEARD. SO THAT THAT IS ON ME. IT'S OKAY. THEY'RE CHEERING IN THE BACK SECTION.

[00:05:02]

THEY SAID BETSY'S FINALLY GOT CUT OFF. THAT WAS PERFECT TIMING. OKAY. ANY QUESTIONS FOR STAFF ON THIS ITEM? I KNOW WE'VE ALL GONE THROUGH A COUPLE OF TRAINING SESSIONS AND YOU KNOW, I WANT TO THANK THE STAFF FOR PUTTING THIS ON ME IN MY LAST 26 HOURS IN OFFICE. I APPRECIATE THAT YOU ALL KNOW HOW TECHNOLOGICALLY SOUND I AM TO BEGIN WITH, BUT THE SYSTEM LOOKS LIKE IT HAS A LOT A BETTER FUNCTIONALITY TO IT. AND I'M SURE I'M SURE MAYOR ELECT HEDRICK, WHO IS WITH US HERE THIS EVENING, WE'LL WE'LL HANDLE THIS SEAMLESSLY. THANK YOU.

MAYOR. ALL RIGHT. THANK YOU. MOVING ON TO ITEM FOUR, INTERSTATE HIGHWAY 635

[4. IH 635 Reconstruction Project Update Council is requested to receive a status update from the Texas Department of Transportation on the IH 635 reconstruction project, which spans from US 75 to IH 30. The project, which began in 2020, involves a complete rebuild to include continuous frontage roads, five general-purpose lanes, one managed lane, enhanced ramp access, and upgrades to meet modern roadway design standards. The original completion date was December 2024, and TxDOT will provide an update on current progress and any schedule changes]

RECONSTRUCTION PROJECT UPDATE. GOOD EVENING. GOOD EVENING. HOW ARE YOU? VERY GOOD. THANK YOU FOR HAVING ME. I THINK THE FIRST QUESTION IS, CAN I FIND THE PRESENTATION? THAT'S A THAT'S A GOOD QUESTION TO START WITH. YES. I CLOSED THE FOLDER. IF YOU GUYS CAN HELP ME FIND WHERE YOU PUT IT, THAT WILL HELP ME. PRESENTATIONS. GOT A LOT OF CHOICES. SORRY. ARE YOU OKAY? MR. YEP. ALL RIGHT. GOT IT. ALRIGHT. THANK YOU ALL FOR HAVING ME. MAKING SURE IT LOOKS CORRECT. YOU CAN JUST. YEAH, JUST MAKE IT FULL SCREEN. WE SHOULD BE OFF TO THE RACES HERE.

ALL RIGHT. VERY GOOD. THERE WE GO. ALRIGHT. AGAIN. THANK YOU FOR HAVING ME. MY NAME IS SUSAN CLEMONS. I'M THE DISTRICT ENGINEER FOR TEXDOT. HERE TO BRIEF YOU ON OUR LBJ EAST PROJECT. I DID WANT TO START OFF WITH SOME SAFETY STATISTICS. WE LIKE TO START OUT ALL OF OUR MEETINGS WITH JUST KIND OF A SAFETY UPDATE, AND REALLY A PLEA FOR HELP. THIS IS A LOOK AT THE FATALITIES STATEWIDE OVER THE LAST FEW YEARS. GOOD NEWS IS, WELL, THE BAD NEWS. AFTER COVID WE SAW AN INCREASE IN FATALITIES. REALLY. PEOPLE PICKED UP SPEED AND STARTED DRIVING A LOT FASTER. THAT, AND AS A RESULT LED TO MORE CRASHES AS WELL AS MORE FATALITIES.

WE'VE BEEN WORKING VERY HARD ON AN ENGINEERING SOLUTION TO IT, TO THE BEST THAT WE CAN. AND YOU CAN SEE THE TREND IS STARTING TO GO DOWN, BUT DEFINITELY NOT DOWN AS FAST AS WE WOULD LIKE IT TO GO. AND SO THIS IS STATEWIDE, ON AVERAGE, 11 PEOPLE DIE ON OUR ROADWAYS EVERY SINGLE DAY. AND THAT'S SOMETHING THAT WE'RE NOT PROUD OF, THAT WE REALLY WANT TO WORK TO REDUCE. IN THE DALLAS DISTRICT WHERE I COVER, WE COVER SEVEN COUNTIES, INCLUDING DALLAS COUNTY COLLIN, DENTON, ELLIS, NAVARRO, ROCKWALL AND KAUFMAN. THESE ARE THE FATALITIES IN THOSE SEVEN COUNTIES. AND SO THIS LAST YEAR, WE HAD 537, 20, 23. WE HAD 540. SO AGAIN, THE TREND IS GOING DOWN, BUT NOT NEARLY AS FAST AS WE'D LIKE IT TO. AND WE REALLY ARE DOING A LOT OF ENGINEERING SOLUTIONS.

BUT WE FOUND A LOT OF THIS IS DRIVER BEHAVIOR. AND SO TXDOT HAS THE IN THE STREET CAMPAIGN THAT YOU ALL HAVE HEARD OF. OUR GOAL IS TO HAVE NO DEATHS ON OUR ROADWAYS. BUT WE ALSO STARTED A NEW CAMPAIGN TITLED DRIVE LIKE A TEXAN. WE'RE REALLY ASKING FOR THE PUBLIC'S HELP TO SLOW DOWN, BE MORE COURTEOUS AS YOU'RE DRIVING, RESPECT YOUR FELLOW DRIVERS. AND SWE'VE KICKED OFF THIS NEW CAMPAIGN. YOU SHOULD START SEEING ADS ON TV AS WELL AS THE RADIO. AND SO ANYTIME THAT YOU YOU CAN ASK FOR YOUR HELP TO PASS ON THIS MESSAGE THAT WE CAN USE SOME HELP ON JUST DRIVER BEHAVIOR AND HOPEFULLY WE CAN START LOOKING AT A FASTER TREND ON THOSE FATALITIES. BUT NOW GETTING INTO THE MEAT OF THE PROJECT AND THE PRESENTATION, LBJ'S PROJECT OVERVIEW I THINK EVERYONE OF YOU ARE VERY FAMILIAR WITH THIS PROJECT. YOU DRIVE IT EVERY SINGLE DAY, BUT 11 MILES ON 635, WE'RE RECONSTRUCTING TWO MILES ALONG INTERSTATE 30. THAT INCLUDES THE SIX 3530 INTERCHANGE, $1.7 BILLION. WE ARE PROUD THAT THAT NUMBER HAS NOT CHANGED. THAT PRICE HAS NOT GONE UP. YOU'VE SEEN A LOT OF PRICES GO UP OVER THE LAST FEW YEARS. I'M SURE Y'ALL HAVE SEEN IT AS A COUNCIL. WE HAVE NOT RISEN THE PRICE ON THIS PROJECT.

SO THERE'S A LOOK AT THE TYPICAL SECTIONS TODAY. WE'VE GOT FOUR LANES IN EACH DIRECTION FOUR GENERAL PURPOSE LANES. BEFORE WE STARTED, WE HAD ONE TOLL MANAGED LANE IN THE MIDDLE. WHEN WE'RE DONE, WE'RE GOING TO HAVE FIVE GENERAL PURPOSE LANES IN EACH DIRECTION, AS WELL ASOLL MANAGED LANES IN THE CENTER. JUST LOOKING AT THE CONSTRUCTION PROJECTS, I'M GOING TO START

[00:10:03]

CLOSER TO THE HIGH FIVE AND I WILL WORK MY WAY TO EAST. THIS IS LOOKING AT GREENVILLE AVENUE.

IF YOU CAN SEE MY CURSOR, I'M NOT SURE THAT YOU CAN, BUT THE BRIDGES ON THE OUTSIDE OF THE LANES ARE ACTUALLY FUTURE FLYOVERS THAT IF YOU'RE COMING FROM 75, YOU CAN GET OFF ON A FLYOVER AND ACTUALLY GET INTO THE TOLL MANAGED LANES. SO YOU WON'T HAVE TO JOIN THE GENERAL PURPOSE LANES. SO WE KIND OF CALL THOSE WISHBONES INTO THE MIDDLE. ALONG 635, YOU CAN SEE THAT BRIDGE PROGRESSIOION GOING ALONG. HERE'S A LOOK AT ABRAMS ROAD AND FOREST LANE. YOU CAN SEE MOST OF THE BRIDGES ARE FAIRLY COMPLETE. WE'VE GOT TO STILL DO SOME MEDIAN WORK ON TOP OF THE BRIDGES, DO A FEW TIE INS ON THE CITY STREETS. BUT WE'RE GETTING VERY CLOSE AND YOU CAN SEE IN THE MIDDLE WE STILL HAVE SOME MAIN LANE PAVING TO DO THERE IN THE MIDDLE, BUT THIS SECTION OF THE PROJECT IS GETTING VERY CLOSE TO BEING COMPLETE. AS WE CONTINUE ON TO SKILLMAN, THE ARCH BRIDGE WE ARE HOPING TO OPEN AT THE END OF THIS MONTH, EARLY NEXT MONTH.

WE'RE STILL DOING SOME ELECTRICAL WORK ON THE INSIDE OF THE BRIDGE. A LOT OF PEOPLE ARE DRIVING BY AND SAYING, ARE YOU EVER GOING TO OPEN THIS? WE ARE GOING TO OPEN IT. BUT WE WANT TO MAKE SURE ONCE WE OPEN IT THAT WE'RE NOT GOING TO HAVE CONTINUE TO HAVE LANE CLOSURES ON THE BRIDGE. SO WE WANT TO MAKE SURE EVERYTHING IS DONE. ONCE WE DO THAT, YOU CAN SEE THE BRIDGE RIGHT NEXT TO IT. WE'VE GOT TO DEMOLISH THAT BRIDGE AND SO YOU'LL SEE THAT COME DOWN, AND THAT'S WHEN WE CAN FINISH THE PAVING IN THE MIDDLE THERE THAT YOU SEE THAT'S NOT QUITE COMPLETE. AS WE CONTINUE EAST HERE'S ROYAL LANE, MILLER ROAD AGAIN VERY CLOSE ON THE CITY STREET ABOVE. STILL WORK TO DO IN THE MIDDLE, BUT YOU SHOULD SEE PAVING GOING ALONG. THERE SHOULD BE SEEING DRAINAGE PIPE GO IN THERE. EVERYTHING IS PROGRESSING VERY WELL AT THIS LOCATION. HERE'S A LOOK AT PLANO ROAD. EVERYTHING'S GOING VERY GOOD. WE'VE GOT EVERYBODY SHOVED REALLY ON THE FUTURE NORTHBOUND OR WESTBOUND LANES. AND WE'RE BUILDING THE NEW EASTBOUND OR SOUTHBOUND LANES, IF YOU WILL. YOU SHOULD SEE THOSE BRIDGE COLUMNS GO UP, AND PRETTY SOON YOU'RE GOING TO START SEEING BEAMS ON TOP OF THIS BRIDGE. IT'LL BE A FEW BRIDGES. I'LL SHOW YOU WHICH ONES NEXT, BUT EVERYTHING'S GOING WELL ON PLANO ROAD. HERE IS KINGSLEY AVENUE OR KINGSLEY ROAD. I APOLOGIZE. ONE THING THAT YOU DON'T SEE HERE IS THE CLOSURE OF KINGSLEY HELPED US TREMENDOUSLY, WHICH YOUR CITY STAFF HAS REALLY HELPED US. BUT UNDERNEATH HERE, WE'VE GOT VERY LARGE BOX CULVERTS. THERE'S A DRAINAGE CHANNEL TO THE NORTH OF 635. WE'RE CONNECTING IT TO THE SOUTH. WE WERE ABLE TO GET SEVERAL BOXES IN THERE. IF I BROUGHT LAST MONTH'S AERIALS, YOU COULD SEE IT. BUT WE BURIED FOUR, EIGHT BY FIVE BOXES, WHICH ARE VERY BIG BOXES. WE'RE ABLE TO BURY THAT. AND THEN IF YOU DROVE OVER THERE TODAY, WE PROBABLY HAVE FIVE STEEL BEAMS ALL THE WAY ACROSS ON KINGSLEY. AND SO THIS BRIDGE IS COMING ALONG. YOU SHOULD SEE THAT STEEL GO UP JUST ABOUT EVERY SINGLE DAY AND SHOULD BE PROGRESSING THERE. JUPITER IS THE NEXT INTERSECTION. MOST OF THE BRIDGE SUBSTRUCTURE. THAT'S THE COLUMNS IN THE CAPS. WHAT WE CALL THEM ARE COMPLETE. YOU WILL SEE BIG CRANES MOVING TO THIS LOCATION HERE VERY SOON, BECAUSE THE NEXT BEAMS THAT WE RECEIVE ON THE PROJECT WILL BE SET OVER JUPITER ROAD. WE DON'T HAVE THAT SCHEDULED JUST QUITE YET, BUT THIS IS A BIG, BIG FOCUS FOR US. ONE CHALLENGE THAT WE'VE SEEN IS ALL OF OUR BRIDGE BEAMS ARE ACTUALLY COMING FROM SAN ANTONIO. THEY PRODUCE ALMOST EVERY BRIDGE BEAM IN THE STATE. AND SO WE ARE WAITING IN LINE TO RECEIVE TRUCKS. THERE'S NOT MANY TRUCKS THAT CAN DELIVER THOSE BEAMS. AND SO WE'VE TOLD THEM WE WILL TAKE A BEAM ANYTIME THAT WE CAN GET IT. AND SO BE A LITTLE BIT CAUTIOUS. WE MIGHT TELL YOU THAT WE'RE GOING TO CLOSE THE ROAD AT NIGHT PRETTY QUICKLY, BUT THAT'S REALLY JUST TO PROGRESS THE CONSTRUCTION. NEXT UP IS GARLAND ROAD. HOPEFULLY YOU ALL HAVE SEEN QUITE A BIT OF PROGRESS HERE. YOU SEE THE BRIDGE SUPPORT THERE RIGHT NEXT TO THE RAILROAD TRACK THAT NOW HAS BEAMS ALL THE WAY ACROSS. WE ACTUALLY HAVE HALF OF THE DECKING ACROSS. WE ARE HOPING TO ACTUALLY POUR THE CONCRETE ON THAT BRIDGE PROBABLY WITHIN THE NEXT WEEK OR TWO. AND THE GOAL IS ACTUALLY TO MOVE ALL OF MAIN LANE TRAFFIC OFF OF THE OLD BRIDGE. THIS IS THE LAST ORIGINAL BRIDGE THAT WE HAVE TO DEMO ON THE PROJECT, PUT IT ON THE NEW BRIDGE WE'RE TARGETING MID JULY. AND SO IF YOU ALL ARE KEEPING UP WITH OUR PROGRESS, WE NEED IT TO DRY UP AND QUIT RAINING. BUT OUR GOAL I TO HIT THAT IN MIDDLE OF JULY. AND THAT'LL PUT US TO THE POINT THAT ALL TRAFFIC IS ON NEW BRIDGES, AND THEN WE'RE JUST FINISHING UP THE MIDDLE. SO THIS IS PROBABLY ONE OF OUR BIGGEST PINCH POINTS ON THE PROJECT WORKING OVER CAKES. THEY'VE BEEN GOOD PARTNERS, BUT YOU DO HAVE TO WAIT UNTIL THEY DON'T HAVE ANY TRAINS COMING THROUGH. AND SO THAT IS BEEN A LITTLE BIT OF A COORDINATION EFFORT ACROSS THE KCS LINE. THEN CONTINUING ON EAST HERE IS SHILOH AND NORTHWEST HIGHWAY SHILOH. IF YOU REMEMBER, THE MANAGED LANES WILL TIE INTO SHILOH. SO YOU'LL SEE START SEEING RETAINING WALLS GO UP IN THIS AREA. WE'RE MOVING THE RETAINING WALL CREWS HERE.

[00:15:04]

AND SO YOU'LL START SEEING QUITE A BIT OF WORK IN THE MIDDLE NORTHWEST HIGHWAY, JUST AT THE BACK OF THE PICTURE. THOSE ARE ALSO STEEL BEAMS. AND SO AS SOON AS WE FINISH SETTING THE STEEL GIRDERERS AT KINGSLEY, WE WILL MOVE THE CREW DOWN TO NORTHWEST HIGHWAY. QUITE A BIT OF STEEL TO SET AT THAT LOCATION. NEXT UP IS CENTERVILLE, SO YOU SHOULD SEE THE BRIDGE COLUMNS BE GOING UP.

THEY SHOULD GO UP FAIRLY QUICKLY. ONCE WE SET THE BEAMS AT JUPITER, THE CRANES ARE MOVING TO CENTERVILLE TO HIT THIS LOCATION NEXT. AND SO IF YOU'RE A AN ENGINEERING GEEK LIE ME, THAT'S, THAT'S PRETTY GOOD THING TO WATCH. AND SO YOU SHOULD SEE JUPITER AND CENTERVILLE TO SET THE BEAMS. AND THEN YOU'LL SEE, I'M SURE YOU'VE SEEN MOUNDS OF DIRT IN THE MIDDLE. BELIEVE IT OR NOT, THAT IS ACCOMMODATING ALL OF THE DRAINAGE STRUCTURE THAT GOES IN.

I KEEP I'M LIKE, WHERE'S ALL THIS DIRT COMING FROM? STOP GENERATING MORE DIRT. BUT WE ARE PUTTING IN A MASSIVE DRAINAGE SYSTEM DOWN THE MIDDLE OF THAT. AND SO WE'RE GOING TO START HAULING THAT OFF PRETTY QUICKLY. THE NEXT PICTURE IS THERE. WE'VE GOT LA PRADA CLOSED AGAIN, QUITE A BIT OF DRAINAGE WORK. YOU CAN SEE THE POND TO THE RIGHT OF THE PICTURE. WE ARE ACTUALLY PUTTING IN A NEW BRIDGE OR I'M SORRY, A BOX CULVERT THAT GOES ACROSS THAT ALLOW THAT POND TO DRAIN INTO DUCK CREEK. AND SO THAT IS PROBABLY WEEKS AWAY FROM GETTING PUNCHED THROUGH. AND THEN THAT SHOULD SEE QUITE A BIT OF DRAINAGE RELIEF. SO THERE IS A LOT THE NEIGHBORHOOD OVER ON THE WEST SIDE OF THE PICTURE ACTUALLY DRAINS ALL THE WAY TO THAT CREEK. AND SO YOU SHOULD START SEEING QUITE A BIT OF RELIEF ONCE WE PUNCH THAT BOX CULVERT THROUGH. NEED A LITTLE BIT OF DRY WEATHER. THE WEATHER HAS DELAYED THIS. THEY WERE HOPING TO BE FURTHER ALONG HERE AT LA PRADA, BUT IT WON'T STOP RAINING ON US. THEN LOOKING AT OATS AND GALLOWAY. THESE THESE BRIDGES ARE GOING WELL. OATS IS VERY CLOSE TO. WE'VE GOT TO TIE IN THE PAVING ON EACH SIDE. BUT THE BRIDGE DECK IS ACTUALLY COMPLETE THERE AT GALLOWAY. IT LOOKS LIKE WE DON'T HAVE THE BRIDGE BEAMS UP. THOSE ALL THOSE BRIDGE BEAMS ARE UP. YOU'LL START SEEING THE DECKING GOING ACROSS ON GALLOWAY. AND SO THAT'S ONLY A MATTER OF TIME UNTIL THAT BRIDGE DECK IS COMPLETE. CONTINUING INTO THE INTERCHANGE, YOU CAN SEE WE'VE GOT EVERYBODY PRETTY MUCH SHOVED OVER ONTO THE SOUTHBOUND LANES. WE ARE WORKING THE NORTHBOUND LANES. YOU MIGHT THINK THAT IT'S TAKING US FOREVER OVER THERE. THAT IS SOME OF THE WORST SOIL THAT WE HAVE IN THE METROPLEX RIGHT THROUGH THAT INTERCHANGE. SO THEY'VE ACTUALLY GOT TO UNDERCUT THAT PAVING 40IN, TAKE THAT OUT AND THEN BRING IN NEW, BETTER MATERIAL JUST SO THAT WE MAKE SURE THAT WE'VE GOT A PAVEMENT STRUCTURE THAT IS GOING TO LAST. AND SO IT SEEMS LIKE IT'S TAKING A LONG TIME, BUT THAT'S WORK THAT THAT TAKES TIME. AND SO WE'RE GOING TO MAKE SURE THAT WE'RE GOING TO GET PAVEMENT SURFACE THAT LASTS. BUT THEY'RE PROBABLY LOOKING AT AUGUST TO HAVE ALL THE NORTHBOUND LANES FINISHED. AND THEN WE'LL MOVE TRAFFIC ONTO THE NORTHBOUND LANES AND COMPLETE THOSE SOUTHBOUND LANES. ALONG INTERSTATE 30. HERE AT GUS THOMPSON, YOU CAN SEE JUST ABOUT ALL OF GUS THOMASSON IS COMPLETE. WE'VE GOT ONE MORE CORNER OF A TURN LANE THAT WE'VE GOT TO FINISH UP, BUT IT'S LOOKING VERY GOOD AS WELL AS THERE'S A LITTLE BIT MORE WORK ON THE MAIN LANES THAT WE'RE FINISHING UP ALONG 30 ON GUS THOMPSON. SAME THING AT GALLOWAY. GALLOWAY ISIS GTING VERY CLOSE. WE'VE GOT TO TIE IN BOTH SIDES OF THE BRIDGE, BUT THE BRIDGE IS COMPLETE AND SO STARTING TO CLEAN UP. THEY USED TO HAVE A BATCH PLANT ON ONE CORNER OF THE GALLOWAY BRIDGE THAT HAS BEEN PACKED UP AND MOVED ALONG BECAUSE THEY NO LONGER NEED IT. AND SO THEY'RE STARTING TO FINISH THE FINISHING TOUCHES ALONG INTERSTATE 30 IN GALLOWAY. SO JUST LOOKING AT THE NUMBERS, THEY'VE DONE A TREMENDOUS AMOUNT OF WORK REALLY. THE EARTHWORK IS 75, 80% COMPLETE EXCAVATIONS, 90%, EMBANKMENT 70%. THE BRIDGE WORK IS REALLY WHAT CATCHES MY EYE. WE'RE ABOUT 75% COMPLETE. USUALLY ONCE THE BRIDGE IS COMPLETE, THE PAVING WILL WILL FINISH SHORTLY THEREAFTER. AND SO EVERYTHING'S MOVING ALONG. I KNOW THIS IS PROBABLY THE SLIDE THAT YOU CARE MOST ABOUT IS THE COMPLETI DATE. WE ARE LOOKING TO OPEN THE FIVE GENERAL PURPOSE LANES END OF 2025 EARLY 2026. LAST TIME I WAS HERE, I TOLD YOU BY THE END OF 2025, WE'RE NOT PROUD THAT IT IS SLID A LITTLE BIT, BUT I WILL TELL YOU THAT THEY ARE WORKING SEVEN DAYS A WEEK. IF YOU DRIVE THROUGH HERE, THEY HAVE EVERY CREW WORKING SIX DAYS A WEEK, AND THEY ARE WORKING THE CRITICAL PATH SEVEN DAYS A WEEK. USUALLY IF I STAND BACK THE DATE A LITTLE BIT, OUR GOAL IS TO REALLY MEET THAT 2025 DATE. BUT I DID WANT TO GIVE SOME CUSHION. IF IT DOESN'T STOP RAINING, IT'S GOING TO BE VERY CHALLENGING TO MEET THAT END OF 2025 DATE.E. THE MANAGED LANES WILL COME SHORTLY AFTER THAT IN THE SPRING AS WELL AS THE CITY STREETS. LIKE I SAID, I'M NOT PROUD THAT THE DATE HAS PUSHED. THE GOOD NEWS IS OUR PRICE HAS NOT INCREASED AND SO THAT'S A BENEFIT. THEY ARE WORKING. THEY'RE TRYING TO BRING ON MORE CREWS. IT HAS BEEN A CHALLENGE THIS LAST YEAR. BUT I WILL SAY THAT NOT EVERY CONTRACTOR IN THE METROPLEX IS WORKING SEVEN DAYS A WEEK. SO I DO APPRECIATE THEM AT LEAST TRYING TO GET SOME WORK

[00:20:03]

DONE SEVEN DAYS A WEEK. AND THAT IS THE COMPLETION OF MY PRESENTATION. HAPPY TO ANSWER ANY QUESTIONS. VERY GOOD. ANY QUESTIONS ON THE PRESENTATION. DEPUTY MAYOR PRO TEM, LOOK, THANK YOU VERY MUCH FOR YOUR PRESENTATION. I'M SO DISAPPOINTED. BUT I DO UNDERSTAND IT HAS RAINED A LOT. I DO WHEN I'M TRAVELING ON 635. I AM SEEING WORKERS THERE CONSTANTLY. I, I REALIZE THAT YOU HAVE A LOT OF CHALLENGES IN THIS PROJECT, SO I APPRECIATE ALL THE HARD WORK WHEN YOU CLOSE, WHEN YOU START WORKING ON THAT CENTERVILLE INTERSECTION, ARE YOU GOING TO CLOSE IT DOWN LIKE KINGSLEY AND OR NORTHWEST HIGHWAY, WHERE IT WAS A TEMPORARY CLOSURE? THAT'S NOT THE PLAN RIGHT NOW. WE'VE GOT A PHASING PLAN THAT WE CAN KEEP TWO LANES IN EACH DIRECTION PLUS TURN LANES. SO WE ARE GOING TO TRY TO PHASE IT. WE'RE PRETTY NERVOUS IF WE WERE TCLOSE IT. THERE'S A LOT OF TRAFFIC ON CENTERVILLE, SO WE DON'T THINK CLOSING IT COMPLETELY IS A GOOD IDEA. WE DON'T THINK ILL SAVE THAT MUCH TIME. SO YOU'LL START SEEING PHASING. BUT OUR GOAL IS TO TRY TO KE TRAFFIC MOVING THROUGH THE BEST THAT WE CAN.

GREAT. AND THAT SOUTHBOUND CENTERVILLE, WHEN YOU GO GET ON TO. YEAH. ARE YOU ADDING YOU'RE STILL ADDING THE SECOND LEFT TURN LANE. THERE WE ARE. THERE WILL BE A TIME THAT WE WILL HAVE TO RESTRICT IT TO ONE LEFT TURN LANE. AND SO BEAR WITH US. BUT THAT PHASING ALONG CENTERVILLE IS NOT EASY BY ANY MEANS, SO THAT YOU WILL HAVE A PERIOD OF TIME THAT YOU ONLY HAVE ONE LEFT TURN LANE, BUT IN THE PERMANENT CONDITION WILL HAVE TWO LEFT TURN LANES, AND WHERE WE CAN ACCOMMODATE TWO DURING PHASING WE WILL, BUT IT'LL BE CHALLENGING AS LONG AS WE HAVE ONE A SECOND LANE. IN THE END, I THINK EVERYBODY'S GOING TO HAVE A SECOND MUCH HAPPIER BECAUSE THAT IS A VERY FRUSTRATING ACCESS POINT FOR US TO GET ON TO. 635 AGAIN, THANK YOU SO MUCH. I APPRECIATE YOU COMING DOWN AND TALKING TO US. AND IF THERE'S THERE IS ONE OTHER THING, TWO OF MY INTERSECTIONS AT CENTERVILLE AND NORTHWEST HIGHWAY, WE HAVE NO PEDESTRIAN ZONES. AND THOSE SIGNS FOR THOSE FOR THOSE PEDESTRIAN ZONES. YES, THE SIGNS FOR THOSE PEDESTRIAN ZONES ARE ARE TAKEN DOWN QUITE FREQUENTLY DUE TO CONSTRUCTION, WHICH I TOTALLY UNDERSTAND, BUT MAYBE YOU COULD WORK WITH STAFF TO GET TO FIGURE OUT SOMETHING TO KEEP THEM AROUND MORE OFTEN.

YES, IT REALLY HELPS TO HAVE THEM. WE WILL DO BETTER THERE. GREAT. THANK YOU SUSAN. THANK YOU, COUNCILMEMBER THOMAS. YES, THANK YOU FOR COMING OUT. I REALLY APPRECIATE THE PRESENTATION. COULD YOU GO BACK TO SLIDE NINE, PLEASE? YES. SO I HAVE BEEN WATCHING THIS INTERSECTION WITH GREAT INTEREST FOR QUITE SOME TIME NOW. MY FELLOW COUNCIL MEMBERS WILL KNOW THAT I MY DATE NIGHT IS THURSDAY NIGHT. THE WIFE AND I GO KARAOKE AND WE PASS BY THIS EVERY THURSDAY. AND WE'VE BEEN WATCHING VERY EAGERLY TO SEE THE ARCHES OPEN THERE. AND SO WE'RE HOW MANY WEEKS AWAY STILL END OF JUNE, EARLY JULY TARGETING END OF JUNE. WE'VE GOT A LITTLE BIT MORE ELECTRIC WORK INSIDE THE ARCH. AND SO YOU PROBABLY DRIVE BY AND YOU DON'T SEE ANYBODY.

WE'VE GOT A FEW TIE INS ON THE ON THE EACH END, BUT OUR GOAL IS ONCE WE OPEN IT, YOU'RE NOT GOING TO SEE MANY LANE CLOSURES ON TOP OF IT. ONCE WE OPEN IT THERE WILL BE A FEW JUST BECAUSE WE'VE GOT TO GET RID OF THE OLD BRIDGE. BUT END OF JUNE, EARLY JULY, WE'RE TARGETING. OKAY.

VERY GOOD. SO SOME ARE THERE GOING TO BE LIGHTS ON THAT THING OR THERE WILL BE LIGHTS. WE'VE DONE A COUPLE TEST RUNS. MAYBE SOME OF YOU SAW IT. WE'RE TESTING IT AT NIGHT OF COURSE.

AND SO THERE ARE LIGHTS. THEY CAN CHANGE COLORS AS WELL. CITY OF DALLAS IS MAINTAINING THIS BRIDGE AND THEY'LL MAINTAIN THE ILLUMINATION AS WELL. AND SO WE'RE COORDINATING WITH THEM.

OKAY I SEE TWO I SEE TWO ARCHES. ANY CHANCE YOU'LL PAINT THEM GOLD AND GET A CORPORATE SPONSOR? I CAN THINK OF ONE THAT HAS NOT BEEN DISCUSSED, BUT WE'RE ALWAYS LOOKING FOR FUNDING OPPORTUNITIES. SO I'LL SAY THAT. I'M SORRY. I COULDN'T RESIST THAT. SO WE'VE BEEN CALLING IT THE MCDONALD'S. MCDONALD'S NOW FOR A LONG TIME. THAT'S VERY GOOD. AND BUT YES, THAT THAT'S COMING ALONG AND THAT WHOLE INTERCHANGE LEADING UP TO IT AND AWAY FROM IT IS DONE A LOT TO RELIEVE CONGESTION THERE. SO I REALLY APPRECIATE YOUR EFFORTS ON THAT SPOT. JUST ME PERSONALLY. THANK YOU, THANK YOU, THANK YOU, MR. MAYOR. THANK YOU. MAYOR PRO TEM MOORE WILLIAMSON. LET ME BE LAST PLACE. ALL RIGHT. FORCING ME TO LEARN MORE BUTTONS.

COUNCILMEMBER WILLIAMS. ARE. IT'S VERY SENSITIVE. IT HAS TO BE HIT JUST RIGHT. OKAY, OKAY. I SEE THE RED LIGHT NOW. YES. OKAY. DID YOU GO TO THE VERY LAST SLIDE? YES. ONE MORE. OKAY.

[00:25:10]

YOU WEREN'T AROUND WHEN WE FIRST BUILT THE FIRST SCREEN WALL AT THE PRADO AND THE AREA UP THERE.

YES, BUT SINCE WITH ALL THESE CHANGES, WHAT DO YOU THINK IS. IS THE OUTSIDE COMPLETION DATE INCLUDING CITY STREETS? FROM. DO YOU THINK IT'LL BE ANY DIFFERENT? OR YOU THINK IT WILL BE MOVED CLOSER OR FROM FROM THE TIME. WE GOT THE APPROVAL FOR THE WALL AND BUILT THE WALL TO.

NOW, HOW DO YOU LOOK THROUGH YOUR LENS LENSES? WHAT DO YOU THINK? WHAT DO YOU THINK? WE COULD CUT THE RIBBON ON THIS WHOLE PROJECT? ANY ANY PROJECTIONS FOR SAINT SPRING? THEIR SCHEDULE SHOWS APRIL. AND SO I WANTED TO GIVE A LITTLE BIT OF FLUFF, IF YOU WILL, SPRING.

AND SO RIGHT NOW THEIR SCHEDULE IS SHOWING APRIL. WE NEED GOOD WEATHER. AND SO SPRING OF 2026 IS, IS WHEN WE THINK WE WILL BE COMPLETE, ALL LANES ARE OPEN AND THEN WE'LL JUST BE WORKING ON ON PUNCH LIST ITEMS, OKAY. INCLUDING CITY STREETS. YES, SIR. YES. AND THE ONLY THING THAT WILL BE LEFT TO DO IS COMPLETE. WE CALL IT PUNCH LIST. THERE MIGHT BE A FEW THINGS THAT THERE MIGHT BE A BROKEN CONCRETE SIDEWALK PANEL OR SOMETHING LIKE THAT. SO THEY'LL GO AND REPLACE ANYTHING THAT GOT BROKEN DURING CONSTRUCTION. BUT ALL MAIN LANES WILL BE OPEN. ALL CITY STREET LANES WILL BE OPEN. RIGHT NOW THEY'RE SHOWING APRIL, BUT LIKE I SAID, WE NEED SOME GOOD WEATHER, BUT EVERYTHING SHOULD BE OPEN BY THE END OF SPRING OF 2026. THANK YOU VERY MUCH. I APPRECIATE YOUR PRESENTATION. THANK YOU. MAYOR. SIR, BACK TO MAYOR PRO TEM MOORE. THANK YOU, MR. MAYOR AND COUNCIL, I JUST LIKE TO SAY THAT THE NAME SEASON CLIMATE IS KNOWN AROUND THE REGION, AROUND THE STATE AS BEING THE MOST ON TIME PROJECT MANAGER THAT WE WOULD HAVE IN THE WAY OF BRINGING PROJECTS TO FRUITION. WHEN SHE SAYS THEY'RE GOING TO COME, EVEN WITH THE WEATHER BEING AS BAD AS IT IS SOMETIMES, BUT EVEN MORE IMPORTANTLY, KIND OF KEEPING THEM TO A POINT OF THE CAPITALIZATION IS NOT AS OFTEN AS AS IT SHOULD BE DURING AN INFLATIONARY TIME SUCH AS THIS. AND I JUST WANTED TO JUST STOP AND JUST ACKNOWLEDGE IT OR NOT AND JUST SAY, THANK YOU SO VERY MUCH. SERVING ON THE RTC AND DRC AND THE DIFFERENT PLACES I HAVE OPPORTUNITY TO OBSERVE HER AS SHE BRINGS MOST OF THE YOU DEAL WITH MOST OF THE PROJECTS REALLY THAT TAKE PLACE HERE IN THIS REGION. CORRECT? I'VE GOT A BIG TEAM, SO DON'T THINK IT'S JUST ME, BUT I'VE GOT A VERY GOOD TEAM THAT HELPS ME OUT QUITE A BIT. WELL, I JUST WANTED TO SAY THANK YOU SO VERY MUCH FOR THE WORK THAT YOU DO. SHE'S ALWAYS APPROACHABLE. SHE'S ALWAYS ONE THAT WHENEVER WE NEED SOMEONE TO TALK TO ABOUT WHATEVER THE PROJECT MAY BE, SHE'S THERE TO DO SO AND WE'LL BE TALKING TO HER VERY SOON ABOUT THE I-30. YES, SIR. YES. SO THANK YOU SO VERY MUCH FOR COMING THIS EVENING. THANKS FOR HAVING. THANK YOU, MR. MAYOR. AND COUNCIL MEMBER DUTTON. HEY, SO I DO NOT DRIVE ON 635 BECAUSE I DON'T WANT TO DIE. BUT I WILL SAY I ACCIDENTALLY GOT ON THE GARLAND ROAD NEW ENTRANCE AND IT'S AMAZING. SO YOU GUYS HAVE DONE A PHENOMENAL JOB. I'M STILL NOT GOING TO DRIVE ON THAT HIGHWAY, BUT IT IS. AND YOU GUYS HAVE DONE AN AWESOME JOB. I DO, HOWEVER, DRIVE DOWN GARLAND ROAD QUITE OFTEN WHERE YOUR BATCH PLANT IS LOCATED, AND I KNOW THAT OUR STAFF HAS REACHED OUT TO YOU GUYS. SO MY ONLY CONCERN IS THAT WE, WHILE WE'RE WRAPPING UP THIS PROJECT, THAT WE JUST MAKE SURE THAT OUR BATCH PLANT IS STAYING TIDY. YES, IT'S BEEN A POINT OF CONTENTION. I GET PHONE CALLS ALL THE TIME. SO ASIDE FROM ASIDE FROM OUR BATCH PLANT SITUATION, YOU GUYS HAVE DONE A PHENOMENAL JOB AND WEE HOPE THAT THE WILL DO SOME ANTI RAIN DANCES AND SEE IF WE CAN GET Y'ALL GUYS BACK ON TRACK FOR OUR END OF 25. SO BUT THANK YOU AGAIN FOR EVERYTHING. AND WE ARE EXCITED TO GET THIS GET THIS GET THIS FINISHED AND WRAPPED UP CLOSE. AND WE WILL DO BETTER AT THE BATCH PLANT. WE HAVE BEEN WORKING WITH STAFF AND WE UNDERSTAND YOU'LL SEE BETTER EFFORT GOING FORWARD. AWESOME.

THANK YOU SO MUCH. VERY GOOD. ANY ADDITIONAL QUESTIONS? THANK YOU ONCE AGAIN FOR YOUR UPDATE.

KEEPING US ON TRACK. AS FAR AS YOU KNOW, THE AS I'VE SAID BEFORE, THE THOSE AERIAL SHOTS

[00:30:03]

REALLY TELL THE STORY. YOU KNOW, WE SEE IT FROM STREET LEVEL AND YOU CAN'T REALLY YOU KNOW, YOU JUST YOU CAN'T REALLY SEE THE PROGRESS OR YOU CAN'T SEE THE, THE MOTION OF IT. SO THOSE YOUR PRESENTATION CERTAINLY HELPS TO, TO BRING ALL OF THAT TOGETHER. SO THANK YOU. THANK YOU. WELL THANK YOU FOR HAVING ME. WE REALLY APPRECIATE REALLY THE WORKINGELATIONSHIP WE HAVE WITH GARLAND. SO VERY MUCH APPRECIATE IT. THANK YOU. AND FRANCIS, THANK YOU FOR YOUR ONGOING SUPPORT. EXACTLY. ALL RIGHT. MOVING ON TO ITEM FIVE GARLAND CHAMBER MIDYEAR REPORT.

[5. Garland Chamber Mid-Year Report In continuing with the 2024-2025 Action Plan and the City's Contract, the Chamber is required to present biannual reports to City Council. Garland Chamber of Commerce staff will present to City Council a mid-year report.]

LET'S SEE. I JUST. THANK YOU, MIKE. THAT'S FOR TUTORIAL ON TECHNOLOGY. SO.

MAYOR, COUNCIL CITY MANAGER, FRIENDS AND NEIGHBORS. PROUD TO BE HERE THIS EVENING PRESENTING OUR MIDYEAR REPORT ECONOMIC DEVELOPMENT PARTNERSHIP CONTRACT. WE'VE DONE THIS SEVERAL TIMES. AND SO YOU PROBABLY ALL UNDERSTAND WHAT OUR RESPONSIBILITY IN THE ECONOMIC DEVELOPMENT SCHEME, IN PARTNERSHIP WITH THE CITY, WE IN GENERAL ARE RESPONSIBLE FOR THE FOLKS THAT ARE ON THE GROUND RIGHT NOW, THEIR THEIR HEALTH AND WELL-BEING AND THEIR EXPANSION. SO BUSINESS RETENTION. EXPANSION IS THE GENERAL CATEGORY IN WHICH WE WERE WORKING TO DO THAT. THERE WE GO TO DO THAT. WE WORK IN THREE AREAS OF FOCUS. AND SO THE GENERAL CATEGORY OF BUSINESS RETENTION, WHEN YOU HAVE TARGETED RESOURCES, YOU HAVE TO BE TARGETED IN YOUR APPROACH. AND SO OUR APPROACH TO BUSINESS RETENTION IS TO FOCUS ON THE CITY'S HIGHEST RETURN ON, ON. INVESTMENT, THE HIGHEST TAX RATE, THE HIGHEST UTILITY RATES.

AND THAT'S IN GENERAL OR SPECIFICALLY OUR MANUFACTURING COMMUNITY, 350 MANUFACTURERS, JUST OVER 9000 EMPLOYEES. BUT WHEN YOU LOOK AT THE REPORTS, THAT AREA OF GARLAND HAS THE HIGHEST TAX RATE TAXING IMPACT PER ACRE OF ANY PLACE IN THE CITY. SO THAT'S WHERE WE FOCUS ON THE ON THE MANUFACTURING COMMUNITY WHEN WE TALK ABOUT BUSINESS RETENTION, WHEN YOU TALK ABOUT WHAT'S THE BIGGEST FACTOR IN HOLDING ON TO THESE FOLKS, IT'S THEIR PEOPLE. SO THAT'S THE SECOND AREA OF FOCUS IS WORKFORCE DEVELOPMENT. AND WE'LL TALK MORE ABOUT THAT. AND THEN THE CATCH ALL CATEGORY THAT'S NEAR AND DEAR TO MOST OF YOUR HEARTS IS THAT SMALL BUSINESS CATEGORY. WE HAVE ROUGHLY 7000 BUSINESSES IN GARLAND, 90%, 95% ARE CONSIDERED SMALL. SO WHEN YOU'RE ATTACKING THAT, YOU HAVE TO GET VERY INTENTIONAL. SO THE THEME THAT I'M GOING TO USE THROUGHOUT THIS PRESENTATION IS TWO KEY WORDS ENGAGEMENT AND ELEVATION. THE ONLY WAY YOU CAN HELP SOMEBODY IS IF THEY KNOW THAT YOU'RE THERE TO HELP THEM. THAT'S THE ENGAGEMENT PIECE. AND SO YOU'RE GOING TO SEE THAT REPEATED THROUGHOUT ALL OF THE DIFFERENT.

ELEMENTS OF THIS PRESENTATION. SO STARTING WITH BUSINESS RETENTION OUR AGREEMENT SAYS THAT WE'RE SUPPOSED TO VISIT 30 BUSINESSES A YEAR. THAT'S PRETTY MUCH PRETTY STRAIGHTFORWARD. IN THE FIRST HALF WE VISITED 16. THAT'S NOT THE MEAT OF IT. THE MEAT OF IT IS WHAT DO WE LEARN WHEN WE MEET WITH THESE FOLKS? AND SO IN GENERAL, GARLAND FOLKS ARE MANUFACTURERS ARE ARE PRETTY HAPPY IN A TIME WHEN IT'S TOUGH TO BE HAPPY. SOME BIG, BIG ANNOUNCEMENTS. YOU NOTICE THAT.

GENERAL DYNAMICS IS NO LONGER HERE. REP CON USA, A TURKISH COMPANY, HAS PURCHASED THAT FACILITY. THEY'RE EXCITED ABOUT IT BECAUSE IT WILL BRING A WHOLE LOT OF NEW, NEW INVESTMENT.

RETAIN THOSE JOBS. GEODYNAMICS WAS. MOVING OUT OF THAT. THAT SECTOR REPCON IS HERE. ANDERSEN CORPORATION, OUR WINDOW MANUFACTURERS, IS GOING TO BE MAKING 140,000 MORE WINDOWS THAN THE 500,000 ARE MAKING NOW. THAT'S ABOUT A $36 MILLION EXPANSION. ORLANDO WAS A SMALL BUSINESS. JARRETT, NOT JARRETT. GIFFORD SPRINGS COMPANY WAS PURCHASED BY ORLANDO PRECISION.

[00:35:07]

GIFFORD SPRINGS IS THIRD GENERATION. ORLANDO CAME IN NOW BRINGING MORE COMPANIES ALONG WITH THEM. SO IT'S JUST A KIND OF A AN INDICATION OF MOVEMENT. THE REAL MEASURE OF SUCCESS IN THIS AREA, THE REAL WHAT YOU'RE INTERESTED IN, WHAT MATT IS INTERESTED IN FROM A FINANCIAL STANDPOINT IS WHAT DOES THIS MEAN IN TERMS OF TAXABLE VALUES? WE'VE HAD THE BOXES ON THE GROUND FOR A VERY LONG TIME. IT'S WHAT GOING IN THOSE BOXES THAT'S IT'S EXCITING AND WILL GENERATE THE NEW NEW DEVELOPMENT, NEW GROWTH. YOU KNOW, YOU'VE SEEN PRESENTATIONS ON THE BIG EXPANSION AT KRAFT PLASTIPAK, ANDERSEN WINDOWS DAISY BRAND. THESE ARE ALL BRINGING NEW AUTOMATION, NEW BUSINESS, PERSONAL PROPERTY. AND THAT'S GOING TO BE THE GROWTH OF THE FUTURE IN OUR INDUSTRIAL SECTOR. THE WHOLE TRAJECTORY OF MANUFACTURING IS MOVING TOWARDS AI AND AUTOMATION. EVERY TIME YOU AUTOMATE, YOU BRING IN MORE MACHINES, YOU BRING IN MORE ROBOTS, YOU BRING IN MORE EQUIPMENT, YOU'VE INCREASED THE TAX VALUES TO THE CITY. SO THAT'S THAT'S THE EMPHASIS OF OUR WORK WITH WITH OUR MANUFACTURING COMMUNITY. ONE QUICK WORD ABOUT TARIFFS. IT CAME UP IN SEVERAL OF OUR CONVERSATIONS. SOME OF OUR COMPANIES QUEST WINDOWS IS A CANADIAN COMPANY. THEY'RE VERY SPECIFICALLY AFFECTED THERE.

TRANSITION OF THEIR HEADQUARTERS DOWN HERE HAS BEEN PUT ON HOLD UNTIL THAT'S RESOLVED. SOME OTHER SMALLER EXAMPLES OF TARIFFS IN GENERAL. IT'S NOT THE TARIFFS THAT BOTHERS OUR OUR FOLKS. IT'S THE UNCERTAINTY. WE'RE AT A CONFERENCE WITH THE BUSINESS JOURNAL A COUPLE WEEKS AGO. AND THAT'S THAT ATTITUDE ACROSS THE MANUFACTURING COMMUNITY OF NORTH TEXAS IS PREVALENT. NOT KNOWING WHAT THE NEXT DAY IS GOING TO GENERATE. SO. SO THAT'S THE ENGAGEMENT PART OF IT, THE ELEVATION PART OF IT. WHAT DO YOU DO WHEN YOU'VE TALKED TO THESE FOLKS AND YOU BUILD A RELATIONSHIP WITH THEM? HOW DO YOU GET THEM TO THAT NEXT LEVEL? WELL, THAT BRINGS US INTO. SOME SPECIFIC RESOURCES. SINCE 2006, WE'VE HAD THE MANUFACTURERS ASSOCIATION, DCMA. WE FORMED IN 2006. SO 19 YEARS OF HAVING THAT EFFORT FOCUSING ON THE MANUFACTURING COMMUNITY, PROVIDING THEM THE RESOURCES THEY NEED. WITHIN THE LAST YEAR, WE'VE MERGED THAT EFFORT WITH AN EFFORT THAT'S BEING SPEARHEADED BY DALLAS COLLEGE, THIS NEXT GENERATION SECTOR PARTNERSHIPS. SO THE MANUFACTURING SECTOR IS ONE OF NINE SECTOR PARTNERSHIPS THAT THE COLLEGE'S SPUN UP AROUND AROUND DALLAS COUNTY. THE LEADERSHIP FOR THIS, THE SECTOR PARTNERSHIP HAS COME EXCLUSIVELY FROM DCMA. SO WE'RE LEADING THIS EFFORT BECAUSE WE'VE BEEN IN PLACE FOR 20 YEARS. WHEN YOU LOOK AT WHAT RESOURCES AND WHAT THIS SECTOR PARTNERSHIP, WORKFORCE DEVELOPMENT AND HIRING, TECHNICAL AND SPECIALIZED SKILLS, OPERATIONAL EFFICIENCY, EXPANSION, INFRASTRUCTURE, QUALITY, SAFETY AND COST, ALL OF THESE ISSUES ARE WHAT IS GOING TO PROPEL THE MANUFACTURING COMMUNITY GOING FORWARD AND THE RESOURCES AROUND IT. SO WHEN YOU LOOK AT THE HEADLINE OF THIS, THE PARTNERS THAT PUT THIS TOGETHER IS THE DCMA, US WORKFORCE SOLUTIONS, GREATER DALLAS AND DALLAS COLLEGE. AND WHEN YOU LOOK AT THE WORK THAT'S BEING DONE, THIS IS A SAMPLE OF THE ACTION REPORTS, ACTION TEAMM REPORTS. T GETS VERY SPECIFIC AND VERY INTENTIONAL IN TERMS OF INDUSTRY LED ISSUES AND INDUSTRY LED SOLUTIONS. SOME OF THESE ARE SHORT TERM. SOME OF THESE ARE JUST HOW DO YOU DO A BETTER JOB OF RECRUITING AND TRAINING. SOME OF THESE ARE LONG TERM IN TERMS OF HOW DO YOU CHANGE ATTITUDES WITH TEACHERS AND STUDENTS AND PARENTS ABOUT THE MANUFACTURING COMMUNITY? ALL OF THIS SPEAKS TO THE FUTURE OF MANUFACTURING. WE TALKED ABOUT AUTOMATION. NOW THIS GETS DOWN TO SPECIFICS. SO THE E WHOLE INTENT OF THIS NEXT GEN SECTOR PARTNERSHIPS IS TO PUT MANUFACTURING IN THE CENTER OF THE ROOM, LISTEN TO THEIR CONCERNS ONCE AND FOR ALL, AND THEN AROUND THE PERIMETER, RESOURCES, EVERYTHING FROM EDUCATION, ECONOMIC DEVELOPMENT, UTILITIES, ANYTHING THAT'S GOING TO IMPACT THE FUTURE OF THAT SECTOR. NOTHING NEW TO US. WE'VE BEEN WORKING ON THAT FOR 20 YEARS IN TERMS OF OUR MANUFACTURING ASSOCIATION. WHAT THIS DOES IS BRING A LOT MORE FOCUS, A LOT MORE RESOURCES. IN ADDITION TO THIS NEXT NEXT GENERATION SECTOR PARTNERSHIPS,

[00:40:01]

WE'RE DOING LOTS OF OTHER THINGS AROUND JOB FAIRS, LEADERSHIP TRAINING, OUR FAME PROGRAM, WHICH IS BUILDING THE MAINTENANCE STAFF FOR THE FUTURE, TECHNICAL TRAINING GRANT, SUPPORTED TRAINING. ALL THESE ARE OLINED IN OUR AGREEMENT. I SAID THREE AREAS OF FOCUS. ONE IS OUR BUSINESS RETENTION. FOCUS ON OUR MANUFACTURING COMMUNITY WORKFORCE DEVELOPMENT. AND THERE'S A WHOLE LOT MORE. I MEAN, MY FRIEND ANDY HESTER SAID, HOW MANY SLIDES DO YOU HAVE, PAUL? AND I SAID, IT'S LIMITED, SO I'LL KEEP THIS TO.

WORKABLE TIME LIMIT. BUT THE SMALL BUSINESS EFFORT AGAIN THE MEASURABLES WAS WE'RE GOING TO DO 30 VISITS A YEAR. WE'VE DONE 18 SO FAR. THAT DOESN'T BEGIN TO TELL THE STORY BECAUSE THAT'S THE THAT'S THE ENGAGEMENT PIECE. THAT'S THE PIECE OF THE ENGAGEMENT PIECE WHERE IT REALLY STARTS TO GET SPECIFIC. AND MEASURABLE IS A PROGRAM WE'RE CALLING THE SMALL BUSINESS 100, WHICH IN BRIEF TERMS IS THE GOAL OVER THE NEXT COUPLE OF YEARS IS TO HAVE 100 BUSINESSES ORGANIZED AROUND INDIVIDUAL PEER DIRECTED ROUNDTABLES. COUNCILMAN BASS, YOU'RE PART OF OUR OUR BETA TESTING EFFORT. OUR INITIAL AND THIS IS WHERE PEERS GET TOGETHER ONCE A MONTH AND SOLVE THE BUSINESS ISSUES, EVERYTHING FROM MARKETING TO COMMUNICATIONS TO ACCOUNTING TO FINANCING EVERYTHING ELSE. AND THEN WHEN YOU SEE THAT OF THE 48 BUSINESSES THAT WE'VE CONTACTED OVER THE LAST YEAR AND A HALF, WE'RE PUTTING THEM IN CATEGORIES. AND SO WE'RE WE'RE TRYING TO MOVE THEM ALL TO A LEVEL FIVE. LEVEL ONE IS THE INITIAL VISIT. THAT'S THE ENGAGEMENT PIECE. LEVEL TWO. THIS IS HOW MANY PEOPLE WE'VE MET WITH THE OWNER AND BUSINESS REPRESENTATIVE. WE'RE AT LEVEL THREE. BUSINESSES HAVE ATTENDED A WORKSHOP AND THEN PART OF A ROUNDTABLE. AND THEN LEVEL FIVE IS WHEN THEY'RE IN THAT ROUNDTABLE. AND THIS IS WHERE WE ARE RIGHT NOW. WHEN WE START TO GET THEIR THEIR SPECIFICS ABOUT THEIR BUSINESS, THAT WE CAN TALK ABOUT HOW TO MOVE THEM UP, ATTACKING SMALL BUSINESS WITH THAT MANY PEOPLE THAT YOU COULD HELP IS MOVING WAY BEYOND JUST DOING WORKSHOPS. AND WE'LL DO THOSE KINDS OF THINGS. WE STILL WE STILL DO WORKSHOPS. BUT WHERE YOU WOULD EXPECT RESULTS IS, ARE WE MOVING THE NEEDLE AS A RESULT, AS A RESULT OF WHAT WE'RE DOING? AND SO THAT'S THE SMALL BUSINESS PROGRAM. NOW, ONE OF THE NEWEST THINGS WE'VE DONE THIS YEAR IS THE GARLAND HISPANIC BUSINESS ASSOCIATION.

WE'VE BEEN TALKING ABOUT THIS FOR A WHILE. YOU LOOK AT THE WORK THAT'S BEEN DONE, A LOT OF WORK. AND THERE'S THESE ARE THE PILLARS THAT THE COMMITTEE THAT LED BY KARINA AND OUR STAFF THAT PUT TOGETHER VISION AND OBJECTIVES, PILLARS, THE TACTICS AND DELIVERY RESOURCES AND RESOURCE ALLOCATIONS. AGAIN. INTENTIONAL, INTENTIONAL, MEASURABLE. NOW THIS IS WHERE I GET TO DO A PUBLIC APOLOGY. TYPICALLY, YOU KNOW, AND JUDD TELLS ME ALL THE TIME, PAUL, YOU PUMP SUNSHINE. THIS IS WHAT YOU'RE GOOD AT AND YOU'RE AN OPTIMIST. WELL, I WASN'T AS IT RELATED TO OUTREACH TO THE HISPANIC COMMUNITY. I'VE LIVED IN GARLAND FOR 35 YEARS. I KNOW OUR DEMOGRAPHICS. BUT STILL, I SAID, BRAND NEW PROGRAM. WE'RE GOING TO PROBABLY GET 30 OR 40 PEOPLE TO SHOW UP. SO WITH KARINA IN THE AUDIENCE AND EVERYBODY LISTENING AT HOME, I'M APOLOGIZING BECAUSE KARINA DIDN'T LISTEN TO ME. SHE SAID, PAUL, THERE'S A LOT MORE EFFORT AND WE'RE GOING TO GET 100. WELL, WHEN YOU LOOK AT THE NEXT SLIDE, 142 BUSINESSES REGISTERED, 86 ACTUALLY ATTENDED, 126 UNIQUE BUSINESSES THAT WE NOW HAVE INFORMATION ON, AND EMPLOYEES SIZE FROM 1 TO 50 BLEW IT OUT OF THE PARK. THIS WAS THE LAUNCH. AND THAT'S JUST THE BEGINNING. WHAT WE'VE DETERMINED FROM THIS SURVEY, THESE ARE THE THINGS THAT THAT COMMUNITY NEEDS. MARKETING STRATEGIES, NAVIGATING LEGAL AND REGULATORY, FINANCIAL MANAGEMENT, ACCESS TO CAPITAL, LACK OF MENTORS AND THEN LANGUAGE BARRIERS. WHEN YOU'RE DEALING THIS COMMUNITY. AND THE PROGRAM IS CONDUCTED ENTIRELY IN SPANISH, ALL THE ALL THE INFORMATION WENT OUT AND YOU SAW THE PREVIOUS SLIDE WHERE THE FLIER WENT OUT. THAT'S HOW YOU RELATE. I KNOW DEPUTY MAYOR PRO TEM, YOU HAD A VERY SPECIFIC INTEREST IN THIS AREA, AND ALL OF YOU DO, BECAUSE YOU HAVE REPRESENTATIVES OF THAT COMMUNITY IN YOUR YOUR BUSINESS, IN YOUR IN YOUR DISTRICTS. SO, KARINA, THANK YOU FOR NOT LISTENING TO ME. THOSE ARE THE

[00:45:04]

THINGS THAT ARE INCLUDED IN OUR AGREEMENT. THOSE ARE THE THINGS THAT WE TALK ABOUT DOING BUSINESS RETENTION, OUR BIG, BIG INDUSTRY THAT GENERATES THE MOST TAXES AND UTILITIES AND EMPLOYMENT. WE'RE FOCUSED ON THAT. THE MANUFACTURING SIDE OF IT WORKFORCE. WE COULD SPEND DAYS TALKING ABOUT ALL THE THINGS THAT WE'RE DOING IN WORKFORCE. IT REALLY IS ABOUT SPECIFICALLY GETTING THE PEOPLE READY TO GO TO WORK. BUT THE REST OF THE CHAMBER IS ENGAGED IN THE WHOLE THE WHOLE EFFORT AROUND ENGAGEMENT FROM RIBBON CUTTINGS. THIS IS HOW WE WELCOME AND PUT A SMILING FACE. AND IN A MARKETING HEAD START WITH NEW BUSINESSES COMING TO TOWN, DIRECT CONNECT AVERAGE OF 112 112 BUSINESSES EACH MONTH. ACTUAL ATTENDEES AROUND 90.

DIRECT CONNECT REGISTRATION 57. ACTUAL 45. WE QUANTIFY OUR NUMBERS VERY SPECIFICALLY.

THAT'S AN INFORM. AND AGAIN, YOU'VE GOT FOLKS IN THEE COUNCIL THAT PARTICIPATE IN THAT. THAT'S HOW WE ENGAGE WITH A WHOLE LOT OF BUSINESSES ON A MONTHLY BASIS. FROM THERE, WE MOVE THEM TOWARDS ROUNDTABLES OR WE MOVE THEM TOWARDS ONE ON ONE SERVICES. THE BUSINESS EXPO. WE DO THAT ANNUALLY. 32 EXHIBITORS, 100 ATTENDEES, AGAIN PUTTING BUSINESS TOGETHER WITH OTHER BUSINESSES AND CUSTOMERS. OUR WOMEN'S INITIATIVE IS SOMETHING THAT'S BEEN GOING ON FOR YEARS, CONTINUES TO GROW 80 TO ATTENDEES AT OUR LAST CONFERENCE. AND THEN LAST BUT NOT LEAST, MOST OF YOU ARE. A LOT OF YOU HAVE PARTICIPATED IN LEADERSHIP. GARLAND. THIS IS CLASS 44 WITH 34 GRADUATES. THAT'S ABOUT AS SUCCINCT AS I CAN MAKE IT. ONE OTHER THING I WANT TO TALK ABOUT IS THE LAST PIECE OF ENGAGEMENT. YOU REMEMBER MY STATEMENT AT THE BEGINNING. YOU CAN ONLY HELP SOMEBODY IF THEY KNOW YOU'RE AVAILABLE AND QUALIFIED TO HELP THEM. THAT'S THAT WHOLE OUTREACH THING. SO THIS YEAR WE'VE ADDED A FULL TIME MARKETING COMMUNICATIONS. THOSE OF YOU THAT HAVE BEEN AROUND THE CITY FOR A WHILE, WILL WILL RECOGNIZE SHERYL LOUDERMILK'S NAME. SHE WAS WITH YOUR COMMUNICATIONS DEPARTMENT, TOOK SOME TIME OFF TO RAISE A FAMILY. NOW SHE'S BACK WITH A WHOLE LOT OF EXPERIENCE. THIS IS ONE EXAMPLE OF HER OUTREACH. THE CANDIDATES VIDEOS HAVE 15 OVER 15,000 SOCIAL MEDIA IMPRESSIONS. THAT'S JUST ONE OF THE AREAS THAT SHE'S WORKING TO INCREASE THE EXPOSURE FOR THE THINGS THAT WE DO TO HELP BUSINESS. SO EVERY TIME SOMEBODY KNOWS ABOUT US, THAT'S SOMEBODY ELSE THAT WE CAN HELP.

AND SO WE'RE EXCITED ABOUT HAVING SHERYL ON STAFF. THIS IS WHAT YOU'RE BUYING. THIS IS THE EIGHT PEOPLE THAT ARE AS COMMITTED TO GROWING GARLAND AS EVERYBODY SITTING AROUND THIS THIS HORSESHOE. AND SO I'M EXCITED. THAT'S BEEN HERE 35 PLUS YEARS. THIS IS THE BEST GROUP OF FOLKS. WE'VE HAD SOME GOOD ONES. BUT IN TERMS OF THEIR COMMITMENT, THEIR EXPERIENCE, THEIR ABILITY TO CONTRIBUTE, IT'S BEST WE'VE HAD. SO SUMMARY. WHEN WE SET OUT TO DO THIS ARRANGEMENT AT THE BEGINNING, WE SET OUT SOME PRETTY BROAD PARAMETERS. LET'S JUST MAKE SOME CONTACTS. LET'S DO SOME GOOD STUFF. NOW WE'VE EVOLVED. THIS IS OUR SECOND YEAR. THE THINGS ARE A LOT MORE SPECIFIC, A LOT MORE MEASURABLE, A LOT MORE THINGS THAT YOU CAN TIE TO YOUR GOALS WITH THE CITY THAT THAT REALLY YOU CAN QUANTIFY MOVING THE NEEDLE IN TERMS OF THEIR SUCCESS. AND SO WE APPRECIATE THE PARTNERSHIP. WE WORK CLOSELY WITH AYAKO ON THE SIDE THAT THAT DOES THE. RECRUITMENT THE REDEVELOPMENT, A LOT OF BIG PROJECTS. AND SO WE'RE PROUD TO BE HERE. IF YOU HAVE ANY QUESTIONS, I'LL PROLONG THIS MEETING BY ANSWERING THEM. SO, YOUR HONOR, ANY QUESTIONS UNDER THIS TOPIC. ALRIGHT. COUNCILMEMBER THOMAS, YES, THANK YOU FOR COMING DOWN. PAUL. I REALLY APPRECIATE THE PRESENTATION. AS YOU KNOW, I AM BRAND NEW TO THIS POSITION. I WAS SWORN IN ONLY NINE DAYS BEFORE I GRADUATED FROM LEADERSHIP. GARLAND, CLASS OF 44. I HAD TO CLAMP MY MOUTH, HAND OVER MY MOUTH TO STOP FROM SAYING THE BEST CLASS BECAUSE I'M IN THAT CULT NOW, AND I WANT TO SAY THAT PROGRAM WAS JUST EXCELLENT EDUCATION FOR ME TO GET TO THIS. I DON'T KNOW IF GRADUATING INTO THE LEADERSHIP OF GARLAND IF THIS IS EXACTLY WHAT YOU MEANT, BUT THAT'S WHY I TOOK THE CLASS, BECAUSE I HAD A

[00:50:03]

FEELING I WOULD BE SITTING RIGHT HERE SOMEDAY. SO I WANT TO SAY THANK YOU FOR THAT. THAT EXCELLENT PROGRAM. REALLY APPRECIATE WHAT YOU DO FOR THAT. AND THE OTHER INFORMATION HERE, I WILL BE LEARNING. AND I'M STILL LIVING IN THE WHIRLWIND AND DRINKING FROM THE FIRE HOSE AS THEY PROMISED I WOULD BE. BUT I WILL TAKE IT IN AS MUCH AS I CAN. BUT I WANT TO SAY THANK YOU SO MUCH FOR WHAT YOU'VE DONE FOR US. ANYBODY ELSE HAS BEEN TO LEADERSHIP YOU WANT TO TALK ABOUT WHICH IS THE BEST CLASS? WE'RE, WE'RE WE'RE NOT GOING TO WE'RE NOT GOING TO GO THERE. I'M GOING TO STEP IN AND SAY THAT DISCUSSION IS NOT HAPPENING. DEPUTY MAYOR PRO TEM, LOOK, THANK YOU SO MUCH FOR COMING TONIGHT. WHEN IS YOUR NEXT MEETING? DO YOU KNOW? IN THE 24TH, WHAT TIME? 1230. WE'LL SEND YOU A NOTICE, PLEASE. THANK YOU, THANK YOU. IS THAT IT? THAT IS, THANK YOU. ANY ADDITIONAL QUESTIONS? PAUL? THANK YOU. NO THANK YOU, THANK YOU. MOVING ON

[6. Update on the Development of a Multi-Use Soccer Complex Staff will provide City Council an update on the development of a multi-use soccer complex and associated infrastructure located near Holford Road and President George Bush Turnpike. Unless otherwise directed by Council, this item will be scheduled for formal consideration at the June 17, 2025 Regular Meeting.]

TO ITEM SIX UPDATE ON DEVELOPMENT OF MULTI USE SOCCER COMPLEX. MR. HESSER. WHILE THEY'RE PULLING THAT UP, MAYOR AND COUNCIL WANTED TO CONTINUE OUR COMMITMENT TO KEEP YOU UPDATED ON THE ON THE SOCCER COMPLEX PROJECT AND CONTINUE TO BE COMMITTED TO TRANSPARENCY INTO THIS PROJECT. AND SO YOU'LL GET A LITTLE BIT MORE COMPREHENSIVE, COMPREHENSIVE PRESENTATION TONIGHT THAT WILL START TO INCLUDE INFORMATION ABOUT CONSTRUCTION TIMELINES AND. WE ARE STARTING TO ENGAGE A CONSTRUCTION MANAGER AT RISK AS WELL ON THIS PROJECT. AND SO YOU'RE GOING TO GET QUITE A FEW UPDATES ON THIS TONIGHT. SOME OF THIS IS A PRELUDE TO ACTION THAT WE'RE REQUESTING YOU TAKE TOMORROW NIGHT ON ON THE LEASE OF THE SOCCER FIELDS FOR THE OPERATION AND MAINTENANCE OF THOSE FIELDS. BUT I WANTED TO SHARE, JUST AGAIN, A MORE COMPREHENSIVE UPDATE HE. WE'VE BEEN COMING TO YOU. AND WITH BITS AND PIECES HERE AND THERE, AS WE'VE BUILT THIS PROJECT FROM THE GROUND UP. BUT I DO WANT TO KEEP IN MIND WHAT THE VISION FOR THIS PROJECT IS, AND THAT IS THAT THAT WE PROVIDE AN AMENITY TO THE COMMUNITY AND AN ECONOMIC, ECONOMIC DEVELOPMENT DRIVER TO THE COMMUNITY AS WELL, THAT THAT WILL NOT ONLY BRING VISITORS TO GARLAND. AND I THINK IT'S A MAJOR PART OF OUR ECONOMIC DEVELOPMENT STRATEGY IS THAT WE PROVIDE DESTINATIONS IN THE COMMUNITY. AND THAT'S EXACTLY WHAT THIS WHAT THIS OVERALL DEVELOPMENT IS ABOUT. AND SO THE TWO MAIN COMPONENTS HERE THAT YOU'LL HEAR ABOUT TONIGHT, THE PUBLIC SOCCER FIELDS AND INFRASTRUCTURE IMPROVEMENTS, THAT'S THE LEASE THAT IS ON YOUR AGENDA F TOMORROW NIGHT HAS TO DO WITH THAT COMPLEX. AND THEN THE MULTI-PURPOSE FACILITY THAT WILL SERVE AS THE HEADQUARTERS FOR THE USL TEAM. WE'RE WORKING ON THAT AS WELL. AND SO BOTH ANDY AND CRYSTAL HAVE INFORMATION TO SHARE TONIGHT ON THIS. AND THEN WE'LL LOOK FORWARD TO ANSWERING ANY QUESTIONS THAT YOU MIGHT HAVE. VERY GOOD. ALL RIGHT. GOOD EVENING MAYOR AND COUNCIL. SO THIS IS JUST A VISUAL EXHIBIT OF THE TWO COMPONENTS THAT MR. REX MENTIONED. AND IN HIS INTRODUCTION YOU'LL SEE THE DK GREEN AREAS. ACTUALLY LET ME START OUT WITH SO YOU CAN ORIENT YOURSELF TO THE RIGHT OF YOUR SCREEN IS PRESIDENT GEORGE BUSH TURNPIKE OR HIGHWAY 190. AT THE VERY TOP OF YOUR SCREEN IS HOLFORD, AND THEN TO THE LEFT IS NAAMAN FOREST. I MEAN, YES, NAAMAN FOREST BOULEVARD. SO YOU'LL SEE THE DARK GREEN AREAS.

THAT IS PART OF THE PUBLIC IMPROVEMENTS THAT MR. REX MENTIONED. THE OTHER COMPONENT OF THE PUBLIC IMPROVEMENTS INCLUDES THE ROADWAYS. AND I WILL TALK ABOUT ALL OF THESE ON AN INDIVIDUAL BASIS HERE IN JUST A MOMENT. AND THEN TO THE RIGHT OF YOUR SCREEN ADJACENT TO PRESIDENT GEORGE BUSH TURNPIKE IS THE MULTI-PURPOSE FACILITY THERE TO THE RIGHT AND DOWN ON THE LOWER RIGHT HAND CORNER. THAT LITTLE OBLONG TYPE BUILDING AT AN ANGLE. AND I REALLY THOUGHT I WAS GOING TO HAVE A CURSOR AND OH, THERE IT IS RIGHT THERE. AWESOME. SO ON THE PROJECT OVERVIEW FOR STREET INFRASTRUCTURE IMPROVEMENTS, LOOKING AT HOLFORD ROAD, THAT'S GOING TO EXTEND FROM PGBT DOWN TO SPRING CREEK FOREST PRESERVE. IT'S A BLUE AREA THAT'S SHOWN ON THERE. IF YOU LOOK AT THAT BLUE AREA, THERE WILL BE A TRANSITION THAT WILL TAKE US FROM THE FROM PDB TO I'M SORRY, FROM NAAMAN FOREST DOWN TO THE SPRING CREEK RESERVE PARKING AREA. BUT THAT'S

[00:55:03]

JUST THE TRANSITION ONLY. AND THEN AT NAAMAN FOREST, THAT'S FROM THE EXISTING RETAIL DEVELOPMENT TO THE EAST, ALL THE WAY OVER TO THE MULTIFAMILY DEVELOPMENT THAT'S WEST OF HOLFORD ROAD, BASICALLY, THAT'S GOING TO CONNECT THOSE TWO PIECES SO THAT WE HAVE A CONTINUOUS BOULEVARD THROUGH THAT ENTIRE AREA THERE. THE ENGINEER WHO WAS SELECTED FOR THIS PROJECT IS KIMLEY-HORN. AND THE BUDGET FOR THIS IS 25.87 MILLION. AND THAT'S IN 2019 BOND FUNDS. THAT'S HOW IT'S GOING TO BE FUNDED. CONTINUING WITH THAT, HOLFORD ROAD IS GOING FROM A TWO LANE ASPHALT ROADWAY TO A DIVIDED CONCRETE STREET. IT WILL HAVE INVERTED MEDIANS FOR DRAINAGE, VERY SIMILAR TO WHAT YOU SEE ON HOLFORD A, WHICH IS CURRENTLY UNDER CONSTRUCTION.

ALMOST COMPLETE ACTUALLY. IT WILL INCLUDE CURBS AS WELL AS DEDICATED BIKE LANES. THOSE DEDICATED BIKE LANES WILL BE ABLE TO BE UTILIZED DURING PEAK INGRESS AND EGRESS INTO THE FACILITY IF NECESSARY, BUT OTHERWISE THEY WILL BE DEDICATED AND STRIPED AS BIKE LANES. AND THEN ON NAAMAN FOREST, IT WILL BE A FOUR LANE DIVIDED CONCRETE STREET. WE'RE NOT GOING FROM ANYTHING BUT GRASS RIGHT NOW BECAUSE IT DOES NOT EXIST. SO IT WILL BE A FOUR LANE DIVIDED CONCRETE STREET WITH OUR STANDARD RAISED MEDIAN. IT WILL INCLUDE CURBS AND GUTTERS WITH UNDERGROUND DRAINAGE, AS WELL AS ENHANCED PEDESTRIAN INFRASTRUCTURE ALONG THAT ROADWAY AS WELL. THE ENGINEER ON THIS IS ALSO KIMLEY-HORN. ONCE AGAIN, THE BUDGET IS 25.87 MILLION AND THAT'S IN THE 2019 BOND FUNDS. SO THE SECOND PUBLIC COMPONENT IS THE PUBLIC SOCCER FIELDS. THAT WILL INCLUDE UP TO EIGHT FIELDS FOR RECREATIONAL ACADEMY AND TRAINING USE.

THERE'S ALSO RESTROOM AND CONCESSION BUILDINGS THAT'S INCLUDED AS PART OF THIS PROJECT, AS WELL AS UP TO TWO PUBLIC FOOTBALL COURTS. THERE WILL ALSO BE ON STREET, I'M SORRY, SURFACE PARKING INCLUDED, AS WELL AS LIGHTING,ANDSCAPING THROUGHOUT AND PARK LIKE ATMOSPHERE THROUGHOUT THE ENTIRE PUBLIC SOCCER FIELD. PART OF THIS PROJECT, ONCE AGAIN, THE ENGINEERS KIMLEY-HORN THE BUDGET IS 25 MILLION AND IT WILL BE FUNDED THROUGH CERTIFICATES OF OBLIGATION. MOVING ON TO THE WHAT MR. REX REFERRED TO AS THE SECOND COMPONENT, I'I'M CALLI IT THE THIRD, THE MULTI-PURPOSE FACILITY THAT IS APPROXIMATELY 28,000FT■S. IT'S WHERE TEAM HEADQUARTERS WILL BE LOCATED. IT WILL INCLUDE A TEAM STORE, PHYSICAL THERAPY FACILITIES, DINING AREAS, LOCKER ROOMS. THE ARCHITECT FOR THIS PROJECT IS OBERLIN PARTNERS, INC, AND THE BUDGET FOR THIS IS 20 MILLION AND IT WILL BE FUNDED THROUGH CASH. SO JUST AS AN OVERVIEW OF THE TIMELINE, BACK ON VALENTINE'S DAY OF THIS YEAR, STAFF CAME FORWARD WITH THE COUNCIL AWARD RECOMMENDATION FOR THE PROJECT ENGINEER THAT WAS KIMLEY-HORN THAT WAS AWARDED ON VALENTINE'S DAY. SHORTLY THEREAFTER, IN MARCH, THE CMAR RFP WAS ADVERTISED TO THE PUBLIC. IT WAS OPEN FOR ABOUT FOUR WEEKS AND IT CLOSED. WHEN IT CLOSED, WE HAD SIX RESPONSES BETWEEN THE TIME THAT WE RECEIVED THE RESPONSES AND WE ACTUALLY MADE THE SELECTION. WE CAME FORWARD WITH A COUNCIL AWARD RECOMMENDATION FOR THE PROJECT ARCHITECT, WHICH WAS OVERLAND PARTNERS. THAT WAS COMPLETED ON MAY 6TH, AND WE HAVE SELECTED THE CMAR AS LEE LEWIS CONSTRUCTION, INC. WE ARE NOT BRINGING THAT FORWARD FOR COUNCIL APPROVAL. IT DOES NOT MEET THE THRESHOLD FOR COUNCIL APPROVAL. BUT IN ORDER TO BE TRANSPARENT, I CERTAINLY WANTED TO BRING IT FORWARD TO SAY THAT AT SOME POINT IN THE FUTURE, ONCE WE GET FURTHER ALONG IN DESIGN, WE WILL BE BRINGING SEVERAL GMPS ALONG THE WAY FOR CONSTRUCTION. AND THEN NOVEMBER 2026 IS THE ANTICIPATED DATE THAT THE TEAM WILL HAVE USE OF THERAINING FACILITY, WITH THE SUTANTIAL COMPLETION TARGETED FOR MARCH 2027. ASSUMING THE STARS ALIGN AND THE SUN KEEPS SHINING AND SO MANY OTHER THINGS HAVE TO COME TOGETHER IN ORDER TO MAKE THIS HAPPEN, BUT THAT IS DEFINITELY OUR TARGET DATE AT THIS TIME, AND I AM GOING TO PAUSE THERE BEFORE I TURN IT OVER TO ANDY TO SEE IF THERE ARE ANY QUESTIONS ABOUT THE PROJECT DELIVERY PORTION, IF THAT'S OKAY. OKAY. GOT COUNCILMEMBER WILLIAMS MISSED MOST OF IT, BUT I, I HEARD THE BEST PART OF GO BACK TO THE LAST FACILITY THAT YOU THAT. YES, SIR. SYSTEM STORES, THERAPY, PHYSICAL

[01:00:04]

THERAPY, DINING LOCKER ROOMS. IT'S A PUBLIC WITH A PUBLIC. HAVE ACCESS TO THAT FACILITY. I DON'T KNOW THE SPECIFICS ON HOW IT WILL BE OCCUPIED. MAYBE THAT'S SOMETHING. OKAY. THEY WILL HAVE ACCESS TO THE TEAM STORE. IT WILL BE A RETAIL RETAIL TEAM STORE, BUT THE REMAINDER OF IT WOULD BE OCCUPIED BY THE ACTUAL TEAM AS THEIR HEADQUARTERS. SO AS OF NOW, I JUST WANT TO MAKE SURE WE'RE GETTING THE RIGHT MESSAGE. THE PUBLIC WILL NOT HAVE ACCESS TO THIS MULTI-PURPOSE FACILITY. IS THAT THAT IS CORRECT? IS THAT. YES, SIR. OKAY. ALL RIGHT, ALL RIGHT. I JUST WANT TO BE SURE I UNDERSTAND BECAUSE I, I'VE GOTTEN THAT QUESTION SINCE THE LAST COUNCIL MEETINGS, AND I WAS CURIOUS BECAUSE THERE WAS SOME, SOME A LITTLE UNCERTAINTY THE LAST TIME. SO I WANT TO BE SURE THAT THAT THAT IS, IT'S BEEN HAS BEEN ADDRESSED IN THIS PRESENTATION HERE. SO THE MULTI-PURPOSE FACILITY, THE PUBLIC WILL NOT HAVE ACCESS TO THAT FACILITY FOR UTILIZATION? NO, SIR. THEY WILL NOT OTHER THAN THE TEAM STORE. AND THAT IS A RETAIL FACILITY. OKAY. I JUST WANT TO BE SURE. CITY MANAGER. THAT'S CORRECT. OKAY. ALL RIGHT.

ALL RIGHT. THANK YOU VERY MUCH FOR YOUR RESPONSE. THANK YOU. MAYOR. MR. THOMAS. YES, GO BACK TO SLIDE FOUR, PLEASE. WAS THAT THE 30,000 FOOT VIEW? MAYBE IT'S THREE. THE FACILITY ITSELF. I DON'T KNOW WHERE IT WAS AT 4 OR 5. THERE WE GO. THREE. SO HOW MANY PARKING SPACES DOES THAT REPRESENT. SO I DON'T HAVE AN ACTUAL COUNT OFF THE TOP OF MY HEAD. BUT I DO WANT TO CAUTION YOU THAT THIS IS A CONCEPTUAL PLAN. WE ARE STILL WORKING OUT ALL THE SPECIFIC DETAILS. YOU NOTICE THAT WHEN I WAS DOING THE PRESENTATION, I DID A LOT OF UP TWOS, AND THE REASON FOR THAT IS, ALTHOUGH THIS IS THE CONCEPT THAT WE ARE WORKING WITH, WE DON'T HAVE THE FINAL DETAILS IN PLACE TO BE ABLE TO SAY THAT WE CAN DELIVER IT SPECIFICALLY LIKE THIS, BUT WE WILL HAVE ADEQUATE PARKING OUT THERE TO ACCOMMODATE THE USE THAT WE ARE PROPOSING FOR THIS AREA. OKAY. VERY GOOD.

THEN ON SLIDE FOUR. THE 25 MILLION THAT INCLUDES EVERYTHING WE SEE IN BLUE THERE AND NAMING FOR. YES. OKAY. I JUST WANT TO MAKE SURE THERE WAS, THERE WAS 225 MILLION. AND I WAS LIKE WAS THAT FOR EACH OR FOR BOTH. NO, IT'S 25.87 FOR THE STREET INFRASTRUCTURE. AND THEN THE 25 MILLION IS FOR THE THAT ONE FOR THE PUBLIC SOCCER FIELDS. RIGHT. FOUR AND FIVE BOTH HAD 25.87.

AND I WANTED TO MAKE SURE THAT WAS ALL THE SAME. ALL FOR THE SAME THING. OKAY. VERY GOOD. I'M VERY EXCITED TO HAVE THIS COME TO MY DISTRICT. THANK YOU. THANK YOU. MAYOR. COUNSELOR DUTTON.

JUST FOR CLARIFICATION, WE WERE SAYING PUBLIC SOCCER FIELDS. HOW MANY OF THOSE SOCCER FIELDS ARE GOING TO BE OPEN ACCESS FOR THE PUBLIC TO USE ON A REGULAR BASIS? RIGHT NOW, THESE THESE EIGHT FIELDS ARE PUBLIC FIELDS THAT ARE GOING TO BE A PERCENTAGE OF THEM AVAILABLE FOR CERTAIN USES AND A PERCENTAGE FOR USES BY THE TEAM. SO WHAT SPECIFIC FIELDS IT WILL BE IS YET TO BE DETERMINED, BUT ALL EIGHT ARE PUBLIC SOCCER FIELDS, LIMITED PUBLIC SOCCER FIELDS.

RIGHT. CORRECT. OKAY. SO THEN WE'VE ALSO SAID UP TO TWO FOOTBALL COURTS UP TO IS KIND OF A SKETCHY I WOULD I WOULD LIKE A MINIMAL OF PUBLIC SOMETHING. THE FOOTBALL COURTS ARE PUBLIC. IT'S JUST WE'RE NOT SURE IF WE'LL BE ABLE TO FIT. TWO. THERE SHOULD BE ONE FOR CERTAIN, BUT WHETHER IT'S 1 OR 2, THEY WILL BOTH BE PUBLIC. OKAY, YOU MAY. YOU MAKE MY HEART POUND A LITTLE HARDER WHEN YOU'RE LIKE, THERE SHOULD BE ONE, BUT HOPEFULLY TWO BECAUSE WE CALL IT PUBLIC. BUT THEN IT'S LIKE, WELL, PUBLIC. BUT IF MAYBE IF YOU IF THE WIND IS BLOWING, RIGHT. THAT'S NOT THE INTENT. THAT'S THE UNNERVING PART ON MY THE WAY MY BRAIN IS HEARING IT IS LIKE I THE UNCERTAINTY OF IT IS VERY HIGH. THIS IS IF I CAN RESPOND TO THAT. THIS IS VERY SIMILAR TO

[01:05:02]

HOW WE RUN WINTER'S PARK, IN THAT WE HAVE AGREEMENTS WITH GARLAND SOCCER ASSOCIATION TO USE THE FIELDS SO THAT THEY HAVE EXCLUSIVE USE TO RUN THEIR PROGRAMS, WHICH ARE OPEN TO THE PUBLIC AT CERTAIN TIMES OF THE YEAR AND CERTAIN NUMBER OF FIELDS. THIS IS GOING TO BE VERY SIMILAR TO WHAT WE DO WITH WINTERS PARK, SO THAT THERE'S A THERE'S SOMEBODY THERE THAT IS USING IT ALL THE TIME, BUT THEIR PROGRAMS AND THEIR ACADEMIES AND WHATNOT ARE OPEN, OPEN TO THE PUBLIC. HOPEFULLY THAT KIND OF MAKES SENSE. BUT THAT'S THAT'S WHAT WE'RE SHOOTING FOR IS A VERY SIMILAR ARRANGEMENT TO WHAT WE HAVE ON OUR EXISTING EXISTING FIELD. OKAY. SO WHEN YOU SAY THEY HAVE ACADEMIES THAT ARE OPEN TO THE PUBLIC, THEN IN TURN MAKES IT A PUBLIC FIELD, IT'S KIND OF DIFFERENT THAN JUST A PUBLIC PARK, YOU KNOW WHAT I MEAN? AND THEY'LL BE OPEN GENERALLY TO THE PUBLIC AT CERTAIN TIMES AS WELL, BECAUSE I HEAR A LOT OF PEOPLE THAT THEIR CURRENT COMPLAINT IS THEY DON'T HAVE ANYWHERE CURRENTLY TO GO PLAY SOCCER THAT IS OPEN IN GENERAL. SO EVEN THE LITTLE BOY SELLING TRYING TO SELL ME SPECTRUM CABLE THE OTHER DAY WAS SAYING, THEY'VE GOT A GROUP OF THEM THAT HAVE THE LITTLE LEAGUE AND BUT THERE'S NOWHERE FOR THEM TO GO JUST PLAY SOCCER. AND SO I'VE TRIED TO SELL OUR FUTSAL COURTS, WHICH IS NOT QUITE THE SAME, BUT YOU KNOW IT WHEN WE SAY PUBLIC, I WANT TO MAKE SURE LIKE THAT WE HAVE THAT THAT DISTINCTION OF WHAT WE'RE LOOKING AT. THE GENERAL PERSON'S IDEA OF PUBLIC VERSUS WHAT IT IS. SO IF WE HAVE PUBLIC SOCCER FIELDS THAT ARE JUST LAYING AROUND UNUSED, PLEASE, BY ALL MEANS LET ME KNOW SO WE CAN GET THEM USED. BUT. THAT'S OKAY. SO I THINK MR. REX IS ACCURATE IN SAYING THAT THEY'RE OPEN TO THE PUBLIC, BUT IN WHETHER IT'S OUR BASEBA OR SOFTBALL OR OUR COMPETITIVE FIELDS ARE NOT OPEN TO THE PUBLIC IN THE SENSE THAT YOU CAN JUST HOP THE FENCE AND GO PLAY WHENEVER YOU WANT TO, BECAUSE THEY END UP NOT BEING IN THE CONDITION THAT THOSE THAT ARE PLAYING LEAGUES COMPETITION WOULD EXPECT FOR THEM TO BE IN. THERE ARE OTHER PARTS OF THE PARK THAT ARE OPEN TO WALK UP, KIND OF PLAY THAT ARE AVAILABLE ON OUR WEBSITE. AND IN TERMS OF SOCCER, THERE'S SOMETIMES JUST WE TRY TO BUILD IN A LOT OF OUR NEIGHBORHOOD PARKS AND SMALLER PARKS, OPEN PLAY, AND SO THEY CAN BE DONE FOR THAT PURPOSE. ARE THEY STRIPED AND NECESSARILY HAVE GOALS? PROBABLY NOT. THERE HAVE BEEN SOME ON OCCASION IN VARIOUS PLACES THAT KIND OF WALK UP PLAY. SO IT DOES EXIST, BUT THEY'RE THEY'RE GOING TO BE KIND OF SPOTTED THROUGHOUT THE CITY, WHETHER IT'S SOFTBALL, OPEN USE FOR SOCCER OR WHATEVER. OKAY. THANK YOU. SO WE'RE WE'RE HAPPY TO ILLUMINATE WHERE THOSE ARE WHEN PEOPLE CALL. THANK YOU I APPRECIATE ALL RIGHT. EXCUSE ME.

ANY ADDITIONAL QUESTIONS BEFORE WE MOVE ON TO THE NEXT SECTION OF THIS. I SEE NONE ANY. ALL RIGHT. I'VE GOT THE EASY PART, AND I DID NOT FULFILL THE MAYOR'S REQUEST COMPLETELY. AND MAKING IT FULL SCREEN. I MADE IT ONLY 97% FULL SCREEN. SO HERE WE GO. SO AS MR. REX ALLUDED TO, WHAT WILL BE UP FOR CONSIDERATION TOMORROW EVENING ARE THE LEASE TERMS FOR THESE SOCCER FIELDS. AND SO TO RECAP THAT'S A $75,000 ANNUAL LEASE PAYMENT WITH A 2.5% ANNUAL ESCALATION. THAT IS FOR AN INITIAL 20 YEAR TERM. THEY WILL MAINTAIN AND MANAGE THE FACILITY, AND THEY WILL ALSO SUBMIT ANNUAL MAINTENANCE, REPAIR AND RENOVATION PLAN AS TO BE APPROVED BY THE CITY AS IT AGES GOING FORWARD. THE MULTI-PURPOSE BUILDING AGAIN APPROXIMATELY 28,000FT■S. THE LEASE WILL PAY THE CITY 350,000 ANNUALLY, PLUS 10% OF NET SPONSORSHIPS OR 50,000, WHICHEVER IS GREATEST. AGAIN, A 20 YEAR TERM. NO RENT FOR THE FIRST 18 MONTHS. TO HELP WITH STARTUP, THEY AGAIN WILL MAINTAIN AND MANAGE THAT FACILITY, COVER THE INSURANCE, UTILITY BILLS AND THINGS THAT GO ALONG WITH IT, AND SUBMIT AN ANNUAL MAINTENANCE, REPAIR AND RENOVATION PLAN. APPROVAL BY THE CITY. AND THAT IS THAT IN A NUTSHELL. OKAY. VERY GOOD. ANY ADDITIONAL QUESTIONS? AND I BELIEVE WE'RE GOING TO DISCUSS THIS FURTHER IN EXECUTIVE SESSION THIS EVENING FOR THOSE. CORRECT. AND THEN IT WILL BE UP FOR FORMAL CONSIDERATION TOMORROW NIGHT. THANK YOU SIR. THANK YOU. MOVING ON TO ITEM

[7. Garland ADA Transition Plan Update Staff will brief City Council on the recent update to the ADA Transition Plan.]

SEVEN GARLAND ADA TRANSITION PLAN UPDATE. I'M GOING TO CLOSE THE FOLDER AGAIN.

[01:10:05]

THERE WE GO. THANK YOU. MAYOR COUNCIL I JUST WANTED TO GO OVER TONIGHT I'M GOING TO PRESENT THE PROJECT WE'VE BEEN WORKING ON FOR THE LAST FEW YEARS, UPDATING OUR ADA TRANSITION PLAN. FIRST I'LL TALK A LITTLE BIT. A LOT OF A LOT OF PEOPLE HAVE HEARD OF ADA REQUIREMENTS OR ADA, A LITTLE BIT ABOUT THAT. WE IT'S SHORT FOR THE AMERICANS WITH DISABILITIES ACT. THAT WAS PASSED IN IN 1990. SO QUITE A WHILE AGO. IT'S A FEDERAL CIVIL RIGHTS LAW MANDATING EQUAL OPPORTUNITY FOR INDIVIDUALS, INDIVIDUALS WITH DISABILITIES, AND IT PROHIBITS DISCRIMINATION IN ACCESS TO JOBS, PUBLIC ACCOMMODATIONS, GOVERNMENT SERVICES, PUBLIC TRANSPORTATION AND TELECOMMUNICATIONS. SO IT'S A PRETTY WIDE RANGING. JUST A LITTLE BIT OF HISTORY ON THAT.

THE IT STARTED BACK IN THE 1960S WITH THE ARCHITECTURAL BARRIERS ACT. AND AT THAT TIME IT WAS FOCUSED A LOT ON JUST PHYSICAL ACCESS, PRIMARILY PEOPLE THAT WERE IN WHEELCHAIRS AND THINGS LIKE THAT THAT WERE DIDN'T WEREN'T ABLE TO ACCESS A LOT OF PUBLIC SPACES. THERE WERE SOME SOME CHANGES AND SOME SOME ADDITIONAL LAWS AND THINGS THAT WERE PASSED IN THE 70S AND 80S, BUT IT REALLY ALL KIND OF CAME TOGETHER IN IN 1990 WITH THE PASSAGE OF THE ADA. AS WITH A LOT OF FEDERAL LAWS, IT TAKES A FEW YEARS TO FIGURE OUT WHAT IT MEANS AND HOW DO WE COMPLY WITH THOSE WITH THAT LAW. AND SO IN 1993, WE DEVELOPED OUR FIRST ADA TRANSITION PLAN. IT WAS PRIMARILY A LIST OF BUILDINGS AND THINGS THAT NEEDED TO BE CHANGED WITHIN THE BUILDINGS, PRIMARILY RAMP ACCESS INTO THE BUILDINGS AND CHANGES IN THE BATHROOMS. THE OVER THE YEARS SINCE THEN, WE'VE DONE OBVIOUSLY A LOT OF CIP PROJECTS, AND ANYTIME A CIP PROJECT WAS DONE OR ANY MAINTENANCE, SIGNIFICANT MAINTENANCE WAS DONE, THAT WAS ALL. WE MADE SURE THAT THAT WAS ADA COMPLIANT WITH WHEN IT WAS BUILT. AND THAT KIND OF LEADS US TO TODAY AND TALKING ABOUT THE UPDATE THAT WE'VE DONE, JUST BRIEFLY, WHAT IS THE TRANSITION PLAN? IT'S REALLY SIMPLY A SYSTEMATIC ANALYSIS OF THE BARRIERS AND HOW TO ELIMINATE THOSE BARRIERS. SO WE IDENTIFY WE INVENTORY WHAT ALL THE BARRIERS ARE IN THE CITY, PROVIDE A SCHEDULE FOR WHEN WE'LL REMOVE THEM AND THEN REMOVE THEM. SO THERE'S BEEN A LOT OF CHANGES SINCE 1993. IN THE ADA ACT IN 1990 REALLY KICKED OFF A LOT OF ACTIVITY IN THIS AREA. THERE'S A LOT OF DIFFERENT ORGANIZATIONS THAT WERE THAT REALLY GOT GOING ABOUT THAT TIME, AND ONE OF WHICH WAS IS CALLED PRO AG PROPOSED ACCESSIBILITY GUIDELINES FOR PEDESTRIAN FACILITIES IN THE PUBLIC RIGHT OF WAY. SO THAT'S A LOT TO SAY. SO IT'S EVERYBODY JUST CALLS IT PRO AG. THAT'S THAT'S REALLY THE COMMITTEE THAT COMES UP WITH BEST PRACTICES AND HOW HOW DO WE MOVE FORWARD WITH MAKING EVERYTHING ACCESSIBLE TO PEOPLE WITH DISABILITIES. THAT WAS THERE WAS A VERSION OF THAT WAS PASSED IN 2011, ALONG WITH SOME NEW ADA STANDARDS THAT WERE ADOPTED INTO BY THE GUIDANCE FROM THE FEDERAL GOVERNMENT. EVEN THAT BACK THEN, WAS IT CONFLICTED BECAUSE IT WAS THERE WAS IT'S ACTUALLY GETS A LOT MORE COMPLICATED WHEN YOU GET INTO THE DETAILS OF SPECIFIC SITUATIONS. AND. YOU YOU CAN MAKE THINGS ACCESSIBLE FOR SOMEONE WITH A PHYSICAL DISABILITY. BUT THEN IF THEY'RE IF THEY'RE SIGHT IMPAIRED OR VISION OR HEARING IMPAIRED, SOMETIMES WHAT WHAT WORKS FOR ONE GROUP IS AT ODDS REALLY WITH WITH ANOTHER GROUP. AND SO THAT'S WHAT THEY'VE REALLY BEEN WRESTLING WITH OVER THE YEARS. AND ACTUALLY, JUST AT THE END OF 2024, THEY'VE REALLY ADOPTED THEIR THEIR FINAL RECOMMENDATIONS. AND IT'S I FEEL LIKE THEY'VE KIND OF SETTLED ON SOMETHING THAT REALLY WORKS FOR EVERYONE. SO IT'S A VERY GOOD THING. THERE'S ALSO BEEN NEW REQUIREMENTS FOR PROGRAMS. SO IF WE HAVE A, A SOMETHING ON THE SQUARE THAT WE NEED TO ADVERTISE, YOU HAVE TO MAKE SURE THAT ALL OF YOUR ALL OF THE PROGRAMS THAT YOU HAVE AT THE CITY ARE, ARE NOT JUST PHYSICALLY ACCESSIBLE, BUT WHEN YOU'RE ADVERTISING FOR THEM THAT THE INFORMATION THAT GOES OUT IS, HAS FONTS THAT PEOPLE CAN READ AND EVERYONE CAN SEE. AND OF COURSE THAT THEN TRANSLATES TO WEB PAGES, WHICH WASN'T EVEN

[01:15:06]

A THING BACK IN 1990. THAT'S. SO THE PURPOSE OF THIS PLAN UPDATE IS REALLY TO PROVIDE A STATUS OF THE OF THE PROJECTS THAT WE SAID WE WERE GOING TO DO IN 1993, EXPAND THE EVALUATION TO PROGRAMS AND SERVICES LIKE I WAS JUST TALKING ABOUT PROVIDE IT PROVIDES GUIDANCE FOR TO HELP US TO EVALUATE OURSELVES AND PROVIDE SELF-EVALUATION FOR THE REST OF THE BARRIERS IN THE CITY PROVIDES A METHOD TO PRIORITIZE THOSE IMPROVEMENTS AND A WAY TO GUIDE THAT IMPLEMENTATION OF THE REMOVAL OF THEIR REMOVAL OF THE BARRIERS. SO WHAT'S ACTUALLY IN THE PLAN? THERE WAS A COPY OF IT THAT WAS ATTACHED IN YOUR PACKET. IT WAS IT WAS LESS THAN 100 PAGES. I'M SURE ALL OF YOU READ EVERY PAGE OF IT, BUT THERE IS A PROVIDES A LITTLE BACKGROUND AND PURPOSE KIND OF WHAT I'M TALKING ABOUT TONIGHT. IT DETAILS THE STANDARDS TO USE AND HOW TO APPLY THEM. SO IT PROVIDES SOME INFORMATION FOR STAFF TO USE. IT PROVIDES IT HAS A LISTING OF ALL OF THE ALL OF THE PROJECTS THAT WERE INCLUDED IN THE 1993 PLAN AND, AND WHAT THE STATUS OF THOSE PROJECTS, WHETHER THEY WERE COMPLETED OR NOT. AS YOU CAN IMAGINE, THERE'S QUITE A FEW OF THE FACILITIES FROM BACK THEN THAT WERE THAT AREN'T THAT DON'T EXIST ANYMORE, THAT WE'VE REPLACED THEM THROUGH CIP PROJECTS. IT ALSO HAS A LISTING OF A NUMBER OF CIP PROJECTS IN PARKS AND TRANSPORTATION AND IN ENGINEERING ROADWAY PROJECTS DIFFERENT ALL THE DIFFERENT CIP PROJECTS THAT WE'VE DONE OVER THE YEARS THAT ARE NOW, AT LEAST WHEN THEY WERE BUILT, THEY WERE UNDER ADA COMPLIANCE AT THE, YOU KNOW, WHEN THEY WERE BUILT. SINCE THE STANDARDS HAVE CHANGED, SOME OF THEM DON'T WOULDN'T NECESSARILY MEET THE CURRENT STANDARD, BUT THEY ARE ADA COMPLIANT BECAUSE THEY'RE BUILT ACCORDING TO THE STANDARD AT THE TIME. PROVIDES INSTRUCTIONS FOR HOW TO CONDUCT THE SELF-EVALUATION, DESIGNATES AN ADA COORDINATOR, DESCRIBES HOW THE PUBLIC CAN SUBMIT INPUT AND COMPLAINTS. ESTABLISHES AN ADA LIAISON COMMITTEE. PROVIDES AN INVENTORY OF FACILITIES TO BE EVALUATED, AND IT DID. WE DID DO A SAMPLING OF BUILDINGS, PARKS, AND INTERSECTIONS SO THAT WE COULD GET GET A BETTER IDEA OF WHAT MAYBE WE HAVE LEFT IN FRONT OF US. SO WHAT WE'RE WHAT THE PROCESS IS, IS GIVING YOU THE BRIEFING TONIGHT. AND THEN I WOULD ASK THAT IF YOU WERE READY TO MOVE FORWARD, WE WOULD HAVE A PUBLIC HEARING AND THEN A POSSIBLE ADOPTION OF THE PLAN ON JULY AT THE JULY 8TH COUNCIL MEETING. THANK YOU. DEPUTY MAYOR PRO TEM. THANK YOU, MR. LUEPKE. HOW DO SIDEWALKS FIT INTO THIS PLAN, SPECIFICALLY, STREET RECONSTRUCTION PROJECTS WHERE SIDEWALKS ARE INCLUDED? WELL, SO ANYTIME WE DO A CONSTRUCTION PROJECT THAT I THINK ALL OF THE STREET PROJECTS. ARE A PART OF THE STREET PROJECTS NOW. AND SO THEY'RE THEY THEY WILL GET BROUGHT UP TO THE CURRENT STANDARD. SO HAVING SIDEWALKS WOULD MAKE, SAY, A NEIGHBORHOOD THAT DOESN'T HAVE SIDEWALKS MORE ADA COMPLIANT. IF THERE'S I CAN'T ANSWER THAT I. KNOW YOU DID. AFTER IF THERE'S NOT ANY EXISTING SIDEWALKS, THEN THE ADA DOES NOT REQUIRE US TO BUILD NEW SIDEWALKS IN THOSE LOCATIONS. THANK YOU. LET'S CLARIFY THAT.

BUT IT'S THE STANDARD PRACTICE NOW TO ADD THOSE WITH STREET RECONSTRUCTIONS. I DON'T KNOW IF WE'RE ADDING THEM BECAUSE I'M NOT SURE. OKAY, GREAT. THANK YOU. OKAY. COUNSELOR DUTTON.

SORRY. IT'S NOT FUNNY. I'M SO SORRY. IS THIS SOMETHING THAT IF WE HAD AN ALL ABILITIES BOARD OR COMMISSION THAT THEY WOULD BE ABLE TO ASSIST WITH? LIKE YOU MENTIONED, THE ADA. COMMITTEE, THAT WOULD NEED TO BE ESTABLISHED. IS THIS SOMETHING THAT. A BOARD, A BOARD OF CITIZENS COULD POTENTIALLY ASSIST YOU GUYS WITH? AS FAR AS LIKE THE MAILERS AND THE ADVERTISEMENTS AND ALL THAT STUFF. SO THE COMMITTEE, THE COMMITTEE THAT'S CALLED FOR IN THE DOCUMENT IS, IS MADE UP OF THE DIRECTORS OF REALLY THE FIVE MAIN HEADS OF THE DEPARTMENTS THAT KIND OF REALLY DEAL WITH THIS, THAT THE PARKS, FACILITIES AND THEN STREETS, ENGINEERING

[01:20:04]

AND TRANSPORTATION. NOT NOT THAT WE COULDN'T THAT THAT WOULD BE KIND OF SOMETHING SEPARATE. I THINK THAT WOULD THEN THE, THE BOARD THAT WE'RE TALKING ABOUT. OKAY. THANK YOU. OKAY. I WAS JUST GOING TO ADD TO THAT THAT YES, THE COMMITTEE THAT THE ADA CONTEMPLATES IS A COMMITTEE, AN ADMINISTRATIVE COMMITTEE AND NOT A NECESSARILY A PUBLIC INPUT COMMITTEE. THERE ARE OTHER FORMS IN WHICH YOU CAN DO THAT. BUT THIS TYPE, THIS COMMITTEE THAT'S DESCRIBED IN THE ADA IS AN ADMINISTRATIVE COMMITTEE. OKAY. ANY ADDITIONAL QUESTIONS ON THIS ITEM? I SEE NONE, MR. LEWICKI.

COUNCIL, WE'VE GOT SEVERAL MORE ITEMS TO COME. WE'RE GOING TO GO AHEAD AND TAKE A QUICK RECESS.

LET'S HAVE EVERYBODY BACK AT ALRIGHT. I'M. ALL RIGHT. COUNCIL. BEFORE WE COME BACK, JUST LET EVERYBODY KNOW. THE BROADCAST THAT'S BEEN GOING OUT THUS FAR HAS NOT HAD ANY AUDIO.

IT'S BEEN RESET DURING OUR BREAK AND THE REBROADCAST WILL HAVE THE AUDIO. SO. WE DON'T YET KNOW WE'RE GOING TO START OVER. WE'RE GOING TO DO THE WHOLE THING OVER. REMEMBER EXACTLY WHAT YOU SAID. AND WE'RE GOING TO, YOU KNOW, DUB IT IN. YEAH. SO. AND ANYTIME YOU'RE READY. READY.

YEAH. ANYTIME YOU'RE READY. NICK. WE'LL BE READY WHEN Y'ALL ARE. I KNOW. YEAH. JUST AS SOON AS NICK PUSHES THE BUTTON. GOOD EVENING. WE ARE COMING BACK FROM RECESS FOR THE MONDAY, JUNE 16TH WORK SESSION FOR THE GARLAND CITY COUNCIL. AND JUST TO LET YOU KNOW, FOR THOSE OF YOU WHO HAVE BEEN WATCHING THE BROADCAST LIVE, WE HAVE HAD SOME AUDIO ISSUES, BUT WE BELIEVE THAT HAS BEEN RESOLVED. AND JUST TO LET YOU KNOW, THE REBROADCAST OF THIS MEETING WILL HAVE THE AUDIO IN PLACE. SO WE ARE COMING BACK TO ITEM EIGHT UPDATE ON MD

[8. Update on MD Health Pathways Program Staff will brief City Council on the MD Health Pathways program and provide an update on discussions with other cities that have implemented the program, as well as outline the resources and actions needed to initiate the program in Garland.]

HEALTH PATHWAYS PROGRAM. GOOD EVENING, MAYOR AND COUNCIL. WE APPRECIATE THE OPPORTUNITY TO VISIT WITH YOU ABOUT MD PATHWAYS AND PROVIDE AN UPDATE THIS EVENING. THIS EVENING I'M JOINED BY DANA MITCHELL. HE'S THE ADMINISTRATOR AND CUSTOMER SERVICE. AND HE'S TAKING THE PLACE OF KEVIN SLAY. THIS AFTERNOON AS KEVIN BECAME A GRANDFATHER THIS MORNING. SO THAT'S WHY HE'S NOT NOT WITH US TODAY. BUT HOPEFULLY THE AUDIO IS WORKING BECAUSE I KNOW HE'S LISTENING. HE'S TEXTING, TEXTING EARLIER. SO WE'LL JUMP INTO THE PRESENTATION HERE. I ALSO WANTED TO RECOGNIZE DOCTOR DIRK WITH THE MD PATHWAYS GROUP IS ALSO HERE AS WELL. SO IF THERE HAPPENED TO BE ANY QUESTIONS HE MAY BE ABLE TO ASSIST WHERE WE CAN'T FILL IN. OKAY. SO WANTED TO INITIALLY TALK ABOUT THE REVIEW PROCESS WE'VE TAKEN AS STAFF AS IT RELATES TO MD PATHWAYS. SO WE'VE HAD SEVERAL OPPORTUNITIES TO VISIT WITH THE MD PATHWAYS TEAM, WHETHER IT'S BEEN THROUGH IN-PERSON MEETINGS OVER THE PHONE AND EMAIL. SO WE'VE HAD QUITE A BIT OF EXCHANGES TO LEARN MORE ABOUT THEIR PROGRAM AND ALSO HOW THEIR PROGRAM HAS FUNCTIONED THROUGH OTHER CITIES AS WELL. WE CURRENTLY HAVE A DRAFT OF A CONTRACT THAT MD PATHWAYS IS PROVIDED, AND OUR LEGAL TEAM IS ASSISTING WITH US ON THE REVIEW OF THAT AGREEMENT. CITY STAFF HAS PROVIDED SOME RECOMMENDATIONS TO BE INCLUDED IN THAT AGREEMENT. SO THAT IS CURRENTLY IN PROCESS OF BEING WORKED ON AT THIS TIME. WE ALSO HAD DISCUSSIONS WITH SEVERAL CITIES THAT HAVE IMPLEMENTED THE PROGRAM AS WELL. AND I'LL GIVE YOU SOME INFORMATION ON THE NEXT SLIDE ABOUT THOSE, THOSE CITIES DISCUSSIONS THAT TOOK PLACE. AND THEN WE ALSO TOOK THE OPPORTUNITY TO WORK WITH OUR CUSTOMER SERVICE TEAM TO HELP UNDERSTAND THEIR OPERATIONS AND HOW A PROGRAM SUCH AS MD PATHWAYS WOULD AFFECT THEIR THEIR OPERATIONS. SO STARTING OFF WITH THE KIND OF THE LESSONS LEARNED, WHAT WE WERE ABLE TO FIND FROM THE CITIES, WE SPOKE WITH DANA AND HIS TEAM SPOKE WITH WITH CRANDALL AND FERRIS. SO WHAT WE LEARNED OR KIND OF TOOK OFF THE BAT WAS THERE'S A SPECTRUM OF CUSTOMERS THAT TYPICALLY OPT OUT OF THIS PROGRAM. IF YOU RECALL, THE MD PATHWAYS PROGRAM IS A PROGRAM THAT IS AN OPT OUT PROGRAM FOR THE TELEHEALTH SERVICES. AND SO IN CRANDALL, THERE WERE ABOUT 19% OF THEIR CUSTOMERS THAT

[01:25:03]

OPTED OUT OF THE PROGRAM. FERRIS HAD ABOUT 5%. SO THIS USING GARLAND'S NUMBERS, IF WE HAD 10% OF OUR CUSTOMERS OPT OUT, THAT WOULD BE ABOUT 7700 CUSTOMERS OF 15,000 OPTED OUT. THAT WOULD BE ABOUT 11,550. ONE THING THAT IS ON THE MINDS OF THE CUSTOMER SERVICE TEAM, AND I KNOW THEY WOULD APPRECIATE ME BRINGING UP HERE, IS THAT WE AVERAGE ABOUT 4500 CALLS DURING OUR BUSY TIME CALL CENTER, AND WE CAN TYPICALLY HANDLE WITHOUT A WHOLE TIME ABOUT 4300 CALLS. AND SO ONE THING TO KEEP IN MIND THAT WE WANT TO ENSURE WE WORK THROUGH CUSTOMER SERVICE. IF WE DO HIT THAT NUMBER OF 7000 PEOPLE OPTING OUT, THAT THAT'S A LOT OF PHONE CALLS THAT'LL BE COMING INTO OUR CALL CENTERS. WE WANT TO MAKE SURE THAT WE'RE PREPARED TO HANDLE THAT CALL VOLUME COMING IN. I ALSO HAD THE OPPORTUNITY TO VISIT WITH THE CITY OF HENDERSON, AND I TOOK THE OPPORTUNITY TO VISIT WITH THE CITY OF HENDERSON, ACTUALLY CLOSE COLLEAGUE WITH THE CITY MANAGER AND HENDERSON. AND ONE OF THE THINGS THAT JAY ABERCROMBIE SHARED WITH ME, THE CITY MANAGER THERE, WAS THAT IT TOOK THEM ABOUT 120 DAYS FOR A PUBLIC EDUCATION PERIOD TO ENSURE THAT THEIR FOLKS WERE UPDATED ON THIS PROCESS, AND THEY KNEW THAT THIS WAS COMING.

AND THEY ALSO SAID IT DID TAKE THEM ABOUT 12 MONTHS. FROM THE INITIAL CONVERSATIONS WITH MD PATHWAYS TO GETTING A CONTRACT EXECUTED AND THE PROGRAM IMPLEMENTED. SO LAST WEEK HAD AN OPPORTUNITY TO VISIT WITH WITH DOCTOR, DOCTOR DIRK AND AS WELL AS BRIAN DAVIS WITH THE MD PATHWAYS TEAM. SO ONE OF THE THINGS THAT THEY HAVE TALKED HEAVILY WITH US ABOUT IS THE ABILITY TO START DEVELOPING EDUCATIONAL MATERIAL AND COMMUNITY OUTREACH PLAN. IF THIS IS SOMETHING THAT THE COUNCIL WANTS TO CONTINUE TO PURSUE, AND WE FEEL THAT'S GOING TO BE A VERY IMPORTANT AND KEY PIECE OF THIS, ENSURING THE COMMUNITY KNOWS THAT THIS PROGRAM IS COMING AND IS WITH THIS AND AS LARGE OF A CITY AS GARLAND IS, THAT THEY WOULD ALSO NEED TO HAVE TIME TO RAMP UP THEIR HIRING FOR STAFFING AS ASSOCIATED WITH THIS PROGRAM AS WELL. SO WHAT THEY WOULD RECOMMEND IS IF THE COUNCIL DOES WANT TO PURSUE SOMETHING OF THIS NATURE OF THIS PROGRAM, THAT SPRING OF 2026 WOULD BE THEIR RECOMMENDATION TO IMPLEMENT THIS PROGRAM. AND THAT, AND I'LL SHOW YOU IN THE NEXT SLIDES, COINCIDES WITH THE PROJECTS THAT WE HAVE GOING ON IN CUSTOMER SERVICE AT THIS TIME. SO, SO BRIEFLY, I'LL GO OVER SOME OF THE PROGRAMS WE HAVE GOING ON IN CUSTOMER SERVICE. THE FIRST IS AN UPGRADE THAT'S TAKING PLACE TO OUR OUR SIS SYSTEM, OR IT'S ESNTIALLY OUR OUR BILLING SYSTEM FOR UTILITY PAYMENTS. AND I'VE HEARD DANA AND KEVIN REFER TO IT AS THE UTILITY SPIDER WEB. IT'S A PROGRAM THAT'S HAD TO BE ESSENTIALLY BUILT AND CUSTOMIZED FOR GARLAND. DUE TO THE UNIQUE NATURE OF GARLAND, THERE ARE NOT MANY CITIES THAT HAVE FULL SERVICE SANITATION, LANDFILL, ELECTRIC, WATER, SEWER SERVICE AS AS WE DO. AND SO IT WAS A SYSTEM THAT HAD TO BE CUSTOMIZED FOR US. AND IT DOES REQUIRE AN UPDATE AT THIS TIME. AND SO THAT DID START IN OCTOBER OF 2024. AND WE'RE CONTINUING TO WORK THROUGH THAT, THAT PROCESS. AND SO WE ANTICIPATE THE UPDATE WILL GO THROUGH 2026. AND SO WE ARE WORKING ON THAT THAT PROCESS AT THIS TIME. AND THAT IS FOR THE FULL IMPLEMENTATION OF THAT PROCESS AS WELL. ONE THING I DID PUT AT THE BOTTOM OF EACH OF THESE PROJECTS IS HOW MANY STAFF MEMBERS AND CUSTOMER SERVICE ARE WORKING ON THE PROJECT. SO DANA'S TEAM HAS A GROUP, THEIR CUSTOMER SERVICE THAT ARE REALLY TECHNICAL IN NATURE, BUT ALSO UNDERSTAND THE UTILITY BILLING PROCESS. AND SO THEY ARE WORKING ON THESE PROJECTS. SO AT ANY GIVEN TIME, THERE'S 4 TO 8 EMPLOYEES AND CUSTOMER SERVICE THAT ARE WORKING ON THIS PROJECT. AND THAT IS JUST THE CUSTOMER SERVICE TEAM THAT DOESN'T INCLUDE THE IT TEAM THAT THAT IS ALSO INVOLVED WITH THIS PROGRAM AS WELL. ONE THING THAT IS IMPORTANT ABOUT THE CUSTOMER SERVICE SOFTWARE, WE DID HAVE A MEETING WITH WITH AWS, WHO IS OUR SOFTWARE PROVIDER, AND THEY HAVE RECOMMENDED WE DO NOT MAKE ANY CHANGES TO THE SOFTWARE SYSTEM UNTIL WE GET THIS UPGRADE IN PLACE. AND SO THAT INCLUDES ANY CHANGES, SUCH AS ADDING A NEW LINE ITEM FOR BILLING, SUCH AS THE BILLING FOR MD PATHWAYS.

AS MR. DARYL KLEIN TALKED ABOUT, I BELIEVE HE WAS AT THE LAST MEETING. THERE WAS A DISCUSSION ABOUT THE ARMY PROJECT THAT'S COMING ON. THIS IS GOING TO BE THE ELECTRIC METER READING PROCESS THAT'S GOING TO START. AS A COUNCIL IS AWARE, THAT'S A VERY TIME INTENSIVE PROJECT. WE ALSO EXPECT WITHIN CUSTOMER SERVICE, THAT SAME TECHNICAL TEAM IS GOING TO BE INVOLVED WITH THIS, AND THIS IS GOING TO BE ABOUT A THREE YEAR PROJECT THAT THAT INITIATES. AND SO THAT PROJECT IS STILL BEING DEFINED AT THIS TIME AND STILL BEING WORKED WITH THE CUSTOMER SERVICE TEAM, BUT DID WANT TO PUT THAT ON THE RADAR AS WELL, THAT THIS IS A PROJECT THAT'S UNDERWAY AND TAKING PLACE AT THIS TIME. THERE IS A UPGRADE TO OUR CASHIERING SOFTWARE THAT'S ALSO TAKING

[01:30:02]

PLACE, AND THAT HAS BEEN IN MOTION SINCE THE BEGINNING OF THE YEAR. THERE ARE THREE STAFF MEMBERS THAT ARE ASSOCIATED WITH THAT PROGRAM AT THIS TIME, AND IT IS ANTICIPATED BY THE END OF THE YEAR THAT THAT WILL BE UPGRADED AND IT WILL BE IN SERVICE AND READY TO GO. THIS NEXT ONE I ACTUALLY FIND FASCINATING IS A SAMSARA IMPLEMENTATION. SO WHAT SAMSARA IS, IS I BELIEVE MOST OF THE COUNCIL IS AWARE THERE ARE CAMERAS ON OUR SANITATION VEHICLES, AND SO WE'RE ABLE TO SEE WHERE OUR TRUCKS HAVE BEEN, AND WE CAN ENSURE THAT TRASH HAS BEEN PICKED UP AT SEVERAL LOCATIONS. BUT WE'RE RUNNING INTO IN THE CUSTOMER SERVICE WORLD RIGHT NOW IS SOMEONE MAY CALL IN AND SAY, HEY, MY TRASH WASN'T PICKED UP YESTERDAY, AND THAT CUSTOMER SERVICE REP THEN HAS TO END THAT CALL. THEY HAVE TO CALL SANITATION, GET A HOLD OF SOMEONE THERE, REFERENCE THAT VIDEO AND THEN CALL BACK THAT PERSON. AND SO IT'S A CIRCLE THAT'S TAKING PLACE. IT'S KEEPING THAT CUSTOMER IN THE LOOP QUITE A BIT LONGER THAN THEY NEED TO BE. WHAT WE'RE WORKING IS TO INTEGRATE THE SAMSARA IMAGES INTO OUR CUSTOMER SERVICE PLATFORM, SO WE CAN MAKE THAT THAT REFERENCE TO THE CUSTOMER RIGHT THEN AND THERE.

WHENEVER THEY HAVE QUESTIONS ABOUT THEIR ABOUT THEIR TRASH SERVICE. SO THAT IS ANTICIPATED TO BE COMPLETED BY THE END OF THE YEAR. AND I BELIEVE THAT'LL SAVE QUITE A BIT OF TIME ASSOCIATED WITH OUR CUSTOMER SERVICE INTERACTIONS WE HAVE RELATED TO SANITATION. SO KIND OF JUMPING THROUGH THE PROJECTS WE HAVE GOING ON. WE ALSO DISCUSSED ABOUT WHAT WE MAY POTENTIALLY NEED TO GET THIS PROJECT GOING AS WELL. SO ONE OF THE THINGS THAT WE TALKED TO BRIAN DIS WITH MD PATHWAYS, AS WELL AS DOCTOR DIRK, WAS THE ABILITY TO HAVE ADDITIONAL STAFFING AS THE STARTUP OF THIS PROGRAM TAKES PLACE. SO FOLKS, TO BE IN THE CALL CENTER AS WE GET THOSE INITIAL OPT OUT CALLS, QUESTIONS, CALLS OF WHAT THIS IS HELPING TO EXPLAIN. AND SO THAT IS SOMETHING THAT WE'RE WORKING TO DEFINE IN THE AND THE AGREEMENT TO ENSURE THAT WE HAVE THE STAFFING AND THE CUSTOMER SUPPORT TO SUPPLEMENT WHAT WE'RE DOING IN OUR CALL CENTER. WE ALSO HAVE BEEN IN CONTACT WITH AWS, THE CUSTOMER SERVICE PLATFORM AS WELL, AND THE IMPLEMENTATION OF A NEW COST OR LINE ITEM ON OUR BILL IS ABOUT $70,000. AND SO THAT'S GOING TO BE ANOTHER COST. WE PUT IN THE AGREEMENT THAT WE ASK THAT THAT BE REIMBURSED TO THE CITY FOR THOSE COSTS TO BE REIMBURSED BACK TO US. AND THEN ALSO WE UTILIZE A BILL PRINTING SERVICE.

AND THIS IS A PRETTY LOW COST, BUT IT'S ABOUT $1,000 TO GET OUR OUR BILL PRINTER TO ADD A LINE TO THE, TO THE BILL THAT'S PRINTED FOR US. AND SO ALSO THROUGH THIS PROCESS, WE SEE THAT WE WOULD NEED ABOUT A 12 MONTH PERIOD TO GET FULLY IMPLEMENTED WITH THIS, WITH THIS PROGRAM. AND AGAIN, I BELIEVE THAT LINES UP WITH THE TIMELINE THAT MD PATHWAYS WOULD LOOK AT AS WELL. IN OUR DISCUSSIONS LAST WEEK WITH DOCTOR DIRK AND BRIAN DAVIS, THERE WAS DISCUSSIONS ABOUT STARTING THIS PROGRAM. ONCE WE HAVE THE AWS UPGRADE IN PLACE, STARTING WITH THE POTENTIAL PILOT PROGRAM, WHETHER IT'S SPECIFICALLY CHURCHES THAT WE START AT, SCHOOL LOCATIONS, SOMETHING TO THAT EFFECT. SO BEING ABLE TO START SMALL, MAKING SURE THAT WE HAVE OUR FOOTING AND THAT WE'RE SUCCESSFUL WITH THIS AND THAT WE CAN IMPLEMENT IT CORRECTLY. SO NEXT STEPS COUNCIL WHAT WE'D WHAT WE WOULD LIKE TO ASK IF THIS IS COUNCIL'S DESIRE TO CONTINUE PURSUING THIS IS WE WOULD LIKE TO FURTHER DEFINE OUR SOFTWARE NEEDS AND OUR PROJECT NEEDS AND CUSTOMER SERVICE. I FEEL LIKE WE'VE DONE A GOOD JOB OF THAT AT THIS POINT, BUT ONE OF THE QUESTION MARKS THAT'S OUT THERE IS STILL THE ARMY PROJECT TO ENSURE THAT WE HAVE THAT PROPERLY DEFINED AND WHERE WE'RE GOING WITH THAT. WE ALSO WANT TO CONTINUE VISITING WITH THE MD PATHWAY FOLKS TO TALK ABOUT THEIR CUSTOMER OUTREACH THAT THEY'RE GOING TO HAVE, AS WELL AS DATA TRANSFER COLLECTION PROCEDURES. THERE'S A LOT OF WHAT WE FEEL IS GOING TO BE BACK AND FORTH BETWEEN US AND MD PATHWAYS AS IT RELATES TO THE TRANSACTIONS THAT TAKE PLACE IN CUSTOMER SERVICE.ND ONE OF THE EXAMPLES THAT WE CAN DEFINITELY TALK ABOUT IS THAT WE HAVE A LOT OF RENTAL PROPERTIES AND ALSO APARTMENTS WITHIN GARLAND. AND SO THERE'S CHANGEOVER IN THOSE THOSE PROPERTIES QUITE OFTEN. AND HOW WE'RE GOING TO COMMUNICATE THAT INFORMATION.

AND THAT CHANGEOVER TO MD PATHWAYS IS A BIG QUESTION MARK FOR US. AND WE WANT TO MAKE SURE WE CLARIFY THAT. WE ALSO HAVE THE CONTRACT UNDER REVIEW, AS WE STATED THAT THE LEGAL TEAM IS ASSISTING US WITH THAT. SO WITH THOSE THREE THINGS, WHAT WE WOULD LIKE TO RECOMMEND IS THAT WE COME BACK TO COUNCIL IN TWO MONTHS. WE PROVIDE AN UPDATE OF WHERE WE'RE AT ON THE CONTRACT, HAVE A FURTHER DEFINITION OF WHERE WE'RE AT FOR CUSTOMER SERVICE, AND ALSO HAVE THOSE FINAL POINTS REALLY NEGOTIATED OUT WITH WITH MD PATHWAYS AND HOPEFULLY IN THE FORM OF THE OF THE AGREEMENT. WITH THAT, WE'RE HAPPY TO ANSWER ANY QUESTIONS THAT YOU MAY HAVE. SO ARE YOU LOOKING AT YOUR TIMELINE? SECOND MEETING IN AUGUST. FIRST MEETING IN SEPTEMBER. I MEAN, IS IT IT WOULD BE THE SECOND MEETING IN AUGUST. IT WOULD BE THE GOAL, YES, SIR, TO HAVE IT BACK. ALL RIGHT. ANY PEOPLE IN ANY. YES. COUNCILOR DUTTON, FIRST, THANK YOU FOR YOUR PRESENTATION. I AM

[01:35:06]

PERSONALLY NOT IN FAVOR OF ASKING FOR REIMBURSEMENT OF THE 70,000, BECAUSE I FEEL LIKE THIS IS A PROGRAM THAT WILL GREATLY BENEFIT OUR CITY. WE JUST TALKED ABOUT A $20 MILLION CASH DEAL ON A SOCCER STADIUM, THAT THE MAJORITY OF OUR CITY IS NOT GOING TO BENEFIT FROM THIS WILL.

THAT IS MY PERSONAL OPINION. I. WE HAVE ALL OF THESE DISCUSSIONS ABOUT BRINGING A HOSPITAL TO GARLAND AND HOW WE HAVE THIS GREAT NEED FOR A HOSPITAL, AND I THINK THAT WE WOULD BE ABSOLUTELY INSANE TO NOT UNDERSTAND THAT THIS IS GOING TO BE A GREAT SELLING POINT TO GET A HOSPITAL BACK IN GARLAND, BECAUSE THE ONE OF THE NUMBER ONE THINGS WITH THE HOSPITAL LEAVING GARLAND IS BECAUSE WE ARE UNDERINSURED, AND WE USE THAT AS A DOCTOR'S OFFICE. THIS IS GOING TO TAKE AWAY A LOT OF THAT BURDEN OFF OF A HOSPITAL. SO I THINK THAT IF WE DON'T REALLY JUST TAKE THAT INTO CONSIDERATION WHILE WE'RE WE NEED A HOSPITAL, WE KNOW THAT.

AND I THINK THAT THIS IS GOING TO BE A GREAT SELLING POINT WHEN WE'RE APPROACHING HOSPITALS OR WHOEVER, TO COME INTO GARLAND LIKE, HEY, WE'VE ALREADY GOT THIS IN PLACE, AND THIS WILL HELP EASE SOME OF THAT BURDEN OFF OF YOU GUYS SO THAT YOU AREN'T JUST SINKING. SO THOSE THOSE ARE MY $0.02. I STILL AM 100% ON BOARD WITH THIS PROGRAM. I THINK THAT THAT A LARGE AMOUNT OF OUR CITY IS GOING TO BENEFIT FROM IT MORE THAN, MORE THAN NOT. SO THANK YOU. THANK YOU, DEPUTY MAYOR PRO TEM. SO YOU'RE TALKING ABOUT CUSTOMER SERVICE AND PEOPLE CALLING IN TO OPT OUT OF THE PROGRAM. IS THAT THE ONLY WAY TO OPT OUT OR ARE THERE OTHER OPTIONS FOR PEOPLE? SO THAT IS ONE THING THAT WE ARE TALKG WITH THE MD PATHWAY FOLKS ABOUT IS HAVING SOME TYPE OF APP OR SOME TYPE OF WEB PORTAL WHERE THEY CAN GO OPT OUT. THE QUESTION IS, IS WHO'S GOING TO PROCESS THOSE ONCE THOSE, THOSE COME IN. SO WE ARE WORKING TOWARDS A RESOLUTION FOR THAT. YES MA'AM. OKAY. GREAT. IT WOULD BE IT WOULD BE NICE TO HAVE SOME KIND OF ELECTRONIC MEANS OF DOING SO. THEN YOU DON'T HAVE TO WORRY SO MUCH ABOUT CUSTOMER SERVICE. BUT ONCE YOU'RE READY AND IF THIS PASSES, I'D LOVE TO INVITE YOU TO A TOWN HALL OF MINE IN THE FUTURE TO TELL EVERYBODY ABOUT IT. SO THANK YOU VERY MUCH FOR COMING TONIGHT. COUNCILOR WILLIAMS. THANK YOU. THANK YOU FOR THE PRESENTATION. I SEE THE GENTLEMAN STANDING NEXT TO YOU SMILING. HE'S JUST STANDING THERE. AND I NOTICED ONE OF YOUR SLIDES YOU WERE TALKING ABOUT CITIES OPTING OUT AND YOU GAVE. YOU GAVE HER MONEY. SLIDE SAID YOU HAD. I'D LIKE TO KNOW. KNOW A LITTLE BIT. JUST JUST JUST A TINKLING AS TO WHAT WERE THE REASONS THAT YOU FOUND THAT FOLKS IN FERRIS AND THE OTHER CITIES OPTED OUT. AND I'D LIKE TO THE GENTLEMAN TO EXTENDING TO YOUR, YOUR LEFT TO ADDRESS THAT. COUNCILMAN WILLIAMS COUNCIL THE MAIN REASON GIVE US YOUR NAME.

OH I'M SORRY DANA MITCHELL AND YOUR ADDRESS. NO, HE'S I'M I'M A SIS. OKAY. ADMINISTRATOR. ALL RIGHT. OKAY, OKAY. I'LL WITHDRAW THAT. GO AHEAD. WHAT I WAS GOING TO SAY IS, DURING THE PROCESS OF INTERVIEWING THESE OTHER TWO CITIES, WE FOUND OUT THAT A LOT OF THE FOLKS THAT DID OPT OUT OF THE PROGRAM, MERELY THEY ALREADY HAD INSURANCE AND THEY DIDN'T NEED THE ADDITIONAL. THAT WAS THE REASONING. AND PIGGYBACK ON COUNCILMAN. NOT THAT I NECESSARILY AGREE OR DISAGREE WITH HER, BUT THERE IS A NEED FOR A HOSPITAL AND THEY CLOSED ON US, LEFT TOWN IN THE MIDDLE OF THE NIGHT? YES, SIR. OKAY. FROM THAT EXPERIENCE, WHAT WOULD YOU WHAT WHAT WERE YOU TAKE A LOOK AT TO? THAT WOULD BE A SELLING POINT FOR MAYBE GETTING A HOSPITAL IN THIS AREA.

COUNCILMEMBER WILLIAMS, I DON'T THINK THAT THROUGH THIS PROGRAM, INITIALLY, WE WOULD BE ABLE TO MAKE A CASE FOR A HOSPITAL. BUT WHAT I BELIEVE WE CAN DO AND IN TALKING WITH DOCTOR DIRK IS THEY WILL BE ABLE TO PROVIDE US DASHBOARDS OF THE TYPE OF USAGE THAT'S COMING FROM THIS PROGRAM SO THAT USERS COULD BE THAT WE HAVE A VERY HIGH COVID OUTBREAK IN THE CITY WHEN THEY START GETTING THOSE TYPE OF CALLS OR FLU OUTBREAKS, BUT ALSO THEY CAN LET US KNOW, WE DO HAVE THIS AMOUNT OF PEOPLE COMING IN TO THE PROGRAM. THERE ARE PEOPLE THAT ARE BEING DIVERTED AWAY

[01:40:02]

FROM FROM ERS, OR THEY ARE HAVING TO REFER PEOPLE OUT TO IN-HOUSE DOCTORS OR TO HOSPITALS BASED ON THE TYPE OF CARE. SO WITH THAT DATA, WE CAN SHARE THAT WITH OUR ECONOMIC DEVELOPMENT TEAM AND SHOW THESE ARE THE TYPE OF FOLKS, AND THIS IS THE NUMBER OF FOLKS THAT ARE BEING REFERRED OUT TO GET ADDITIONAL MEDICAL CARE BEYOND JUST THE TELEHEALTH SERVICE. I UNDERSTAND THAT, YOU KNOW, AND GATHERING POSTMORTEM, IF I COULD DESCRIBE IT THAT WAY. THE FIRST UNIT THAT CLOSED. BAYLOR. BAYLOR GARLAND WAS THE. THE BABY UNIT. RIGHT. OKAY. AND THEN THE DOMINOES FELL. YEAH. AND THEN THE BIG BAYLOR. THEN BEEN NOTIFIED THAT THEN CITY MANAGER WHO WAS ALSO ON THE BOARD. OKAY. WHAT DID YOU LEARN FROM THAT EXPERIENCE OR DID YOU KNOW ANYTHING ABOUT THAT? SO COUNCIL MEMBER WILLIAMS, I APOLOGIZE, BUT I THINK WE'RE I THINK WE'RE STRAYING PRETTY FAR FROM THE HEALTH PATHWAYS. WE'RE TALKING ABOUT A HOSPITAL CLOSURE THAT REALLY IS NOT RELATED TO. LET ME LET ME BACK BACK UP THERE. OKAY. I'M I'M EXCITED TO LISTEN AND LEAVE THE DOORS OPEN FOR YOU. BUT I'M, I'M VERY INTERESTED IN. SOME WAY. THERE'S A NEXUS BETWEEN THE HOSPITAL CLOSING AND THE OPPORTUNITY FOR THE NEW COMPANY TO SERVICES. TO PROVIDE THESE SERVICES TO OUR PUBLIC. SO I'D BE VERY INTERESTED IN IN. AND YOU. THE RATIONALE AND, YOU KNOW, AS SOON AS YOU WORK OUT THE, THE DISCUSSION POINTS. BUT I'D BE VERY INTERESTED IN, IN HEARING FROM YOU. OKAY. AS, AS, AS YOU MOVE THROUGH THIS PROCESS AND, AND ONE THIS THIS IS A PROJECT THAT STANDS STANDS ALONE. BUT I, I WOULD BE INTERESTED IN, IN, IN IF THERE IS A NEXUS THEN THAT WE COULD BUILD ON AND HOPEFULLY BECAUSE HAVING HOSPITAL IS NOT A DEAD ISSUE. OKAY. JUDGE DO YOU HAVE ANY COMMENTS YOU MAKE? YEAH, I THINK AS AS THE TEAM'S ALLUDED TO, THIS IS GOING TO BE AN ONGOING PROCESS THAT WILL COME BACK TO COUNCIL AND PROVIDE REGULAR UPDATES ON THIS IS GOING TO BE A, YOU KNOW, AROUND A 12 MONTH IMPLEMENTATION AND DOES IS GOING TO REQUIRE US TO DEPLOY QUITE A QUITE A LOT OF RESOURCES TO MAKE IT HAPPEN. SO WE'RE WE'RE COMMITTED TO GIVING COUNCIL REGULAR UPDATES ON THE PROJECT AS IT MOVES FORWARD.

OKAY. THANK YOU. THANK YOU MAYOR. THANK MR. THOMAS. WOULD YOU GO BACK TO ABOUT SLIDE THREE. IF THAT WAS THE RIGHT ONE? MAYBE IT WAS FOR I'M SORRY I'M I'M NEW TO THE WHOLE THING HERE. YEAH. NO RIGHT THERE. SO RIGHT HERE YOU TALKED ABOUT AND I KNOW THIS DOESN'T HAVE ANYTHING TO DO WITH MD PATHWAYS. YOU TALKED ABOUT HAVING A SERVICE WHERE IF SOMEONE'S TRASH IS MISSED. SO THOSE ARE THE CALLS I'M GETTING MOST FREQUENTLY. AFTER 34 DAYS IN OFFICE. I THINK THIS WE'RE GOING TO HAVE TO HOLD THAT. THE DISCUSSION IS ABOUT MD PATHWAYS, NOT THE FUTURE. OTHER PROGRAMS OKAY. VERY GOOD. THANK YOU. ALL RIGHT. DEPUTY MAYOR OR NO MAYOR PRO TEM MORE. THANK YOU, MR. MAYOR, I NEED TO I JUST LIKE FOR YOU TO SUMMARIZE WHAT I THINK THAT HAS HAPPENED TO US THUS FAR. THIS CAME TO US AS A RESULT OF COMMUNITY SERVICE COMMITTEE MAKING A RECOMMENDATION. CORRECT? CORRECT. YES, SIR. OKAY. AND AT THAT POINT, IT CAME TO US THROUGH OUR WORK SESSION, SIR. DISCUSSED IT. RIGHT. AND AT THIS POINT, WE'RE SAYING THAT WE'RE GOING TO TURN IT BACK OVER TO STAFF AGAIN TO CONTINUE TO REVIEW SUCH THAT YOU'LL COME BACK TO US AND YOU WILL COME BACK WITH A BECAUSE AT THIS POINT I'M HEARING SUPPORT, BUT I'M LOOKING NOW FOR MORE STAFF RECOMMENDATIONS. WILL YOU BE COMING BACK WITH A STAFF

[01:45:04]

RECOMMENDATION? YES, SIR. AND I APPRECIATE THAT QUESTION. SO IN WORKING WITH THE CITY ATTORNEY'S OFFICE, STAFF HAS MADE RECOMMENDATIONS TO THE CONTRACT THAT'S BEING DRAFTED. AND SO THOSE ARE ITEMS WE'LL BE ABLE TO BRING AFTER WE'VE DISCUSSED THEM WITH THE MD PATHWAYS GROUP OF STIPULATIONS AND THE TERMS AND CONDITIONS OF THE AGREEMENT. THANK YOU, MR. MAYOR. VERY GOOD.

AND COUNCIL MEMBER OTT, I JUST WANTED TO JUST GIVE MY SUPPORT FOR THIS AND THANK YOU FOR ALL THE EFFORTS THAT YOU'VE BEEN PUTTING INTO IT. IT SOUNDS LIKE EVERYTHING IS BEING IS BEING FRUITFULLY WORKED ON. AND THANK YOU FOR THE UPDATE AND LOOK FORWARD TO WHEN YOU COME BACK WITH MORE DETAILS. VERY GOOD. ANY ADDITIONAL QUESTIONS ON THIS ITEM? THANK YOU FOR THE WORK AND THE WORK TO COME AND SEE YOU BACK HERE IN AUGUST. MOVING ON TO ITEM NINE. GARLAND YOUTH

[9. Garland Youth Council Appointee Selection Council is requested to consider amendments to the Code of Ordinances regarding the Garland Youth Council. Amendments include an increase to the number of appointees each City Councilmember is able to select. Unless otherwise directed by Council, this item will be scheduled for formal consideration at the June 17, 2025 Regular Meeting.]

COUNCIL APPOINTEE SELECTION.

ALL RIGHT, HERE WE GO. MAYOR MAY, CITY COUNCIL AND CITY MANAGER REX, THANK YOU FOR HAVING US. I'M JOINED BY RHONDA MCTIER. SHE'S RECREATION SUPERVISOR AND WE ARE HERE TO DISCUSS POTENTIAL CHANGES TO CODE OF ORDINANCES REGARDING THE GARLAND YOUTH COUNCIL. IN YOUR AGENDA PACKET, YOU RECEIVED A DRAFT OF THE REDLINED CODE OF ORDINANCES, BUT WE WANTED TO TAKE AN OPPORTUNITY THIS EVENING TO TALK THROUGH WHAT EACH OF THOSE POTENTIAL CHANGES ARE. SO IN SECTION ONE B, THESE CHANGES ARE REALLY INTENDED TO BE ABLE TO INCREASE THE NUMBER OF APPOINTEES THAT OUR COUNCIL MEMBERS ARE ABLE TO SELECT. SO PREVIOUSLY OR RIGHT NOW, CURRENTLY IN THE CODE OF ORDINANCES, IT ALLOWS FOR 18 SPOTS FOR COUNCIL MEMBERS TO SELECT 18 APPOINTEES. AND THEN IT ALLOWS FOR AN ADDITIONAL TWO OTHER APPOINTEES TO BE SELECTED BY THE CHAIRPERSON OR THE PRESIDENT OF THE GC, WHICH IS ONE OF THE STUDENTS. NOW, IN THE PAST YEARS, THAT HAS NOT REALLY BEEN HAPPENING. SO WE'RE TRYING TO CLEAN UP A LITTLE BIT OF THAT LANGUAGE WITH THIS, BUT ALSO PUT THE SOLE RESPONSIBILITY OF CHOOSING OUR APPOINTEES TO THE YOUTH COUNCIL, WITH OUR COUNCIL MEMBERS. SO THAT IS THE CHANGES HERE. BUT ALSO, AS I MENTIONED EARLIER, INCREASING THE NUMBER. SO IF YOU REMEMBER, WHEN WE PRESENTED IN FRONT OF YOU A FEW WEEKS AGO, AT THE END OF THE YEAR RECAP, WE SAID THAT Y'ALL ISSUED US A CHALLENGE TO INCREASE OUR RECRUITING EFFORTS. WELL, WE WERE SUCCESSFUL IN 2425. WE HAD 18 APPLICANTS. AND FOR THIS UPCOMING YEAR, 2526, THIS YEAR, WE RECEIVED 39 APPLICATIONS. SO WE WOULD LIKE TO AMEND THE CODE OF ORDINANCES TO ALLOW UP TO 36 STUDENTS TO PARTICIPATE IN THIS PROGRAM. AND SO THAT'S WHAT THESE CHANGES REFLECT IN SECTION 1D. THE INTENT OF THESE CHANGES IS TO ALLOW ALL STUDENTS IN GARLAND ISD THE OPPORTUNITY TO APPLY AND BE SELECTED IF YOU GUYS WERE TO CHOOSE THEM. SO CURRENTLY THE CODE OF ORDINANCES ALLOWS FOR STUDENTS THAT LIVE IN GARLAND.

AND SO OUR PROPOSED CHANGES IS SAYING STUDENTS THAT LIVE IN GARLAND AND OR ATTEND A GARLAND ISD SCHOOL. THE OTHER CHANGES IN THIS THAT HAVE TO DO WITH THE APPLICATION IS JUST KIND OF BETTER ALIGNING OUR CURRENT PRACTICES WITH WHAT'S IN THE CODE OF ORDINANCES. FOR EXAMPLE, RIGHT NOW IT MENTIONS THAT OUR APPLICANTS COMPLETE A STANDARD BOARDS AND COMMISSIONS APPLICATION, WHICH IS A LITTLE BIT DIFFERENT. SO I'M JUST TRYING TO KIND OF CLEAR OUT THAT LANGUAGE. IT ALSO MENTIONS THAT THE APPLICANTS FILL OUT AN ESSAY. WE'RE ACTUALLY ASKING THEM QUESTIONS LONG FORM QUESTIONS. SO AGAIN JUST TRYING TO CLEAN UP THAT LANGUAGE A LITTLE BIT BETTER ALIGN IT WITH WHAT WE'RE ACTUALLY DOING. AND THEN WHILE WE'RE AT IT BETTER ALIGNING IN SECTION ONE, F IT RIGHT NOW MENTIONS THAT WE MEET ONCE A MONTH, BUT THERE ARE MONTHS THAT WE ACTUALLY MEET TWICE. SO TAKING THE OPPORTUNITY WHILE WE'RE AT IT TO GO AHEAD AND SAY AT LEAST ONCE AND JUST MAKE IT ALL TRUTHFUL. SO THOSE ARE OUR PROPOSED CHANGES AND WE'RE GOING TO ANSWER QUESTIONS. BUT ALSO JUST WANTED TO GIVE YOU ALL A HEADS UP THAT THIS IS ON THE AGENDA FOR TOMORROW FOR APPROVAL. SO IF YOU HAVE ANY QUESTIONS OR RECOMMENDATIONS WE ARE HAPPY TO ENTERTAIN THOSE NOW. OKAY. COUNSELOR DUTTON, I JUST WANT TO SAY CONGRATULATIONS ON ALL OF THOSE APPLICATIONS BECAUSE THAT IS A PHENOMENAL. YOU GUYS HAVE DONE GREAT THINGS

[01:50:03]

OVER THE LAST YEAR THAT YOU'VE HAD IT. SO I'M SUPER EXCITED THAT WE GET TO HAVE MORE KIDDOS JOIN US AND GET TO SEE WHAT THE CITY LIFE IS ALL ABOUT. SO THANK YOU SO MUCH FOR ALL OF YOUR HARD WORK. YOU'RE AMAZING. THANK YOU. OKAY, COUNSELOR WILLIAMS, GOOD EVENING LADIES, LADIES, I ONLY HAVE ONE ONE QUESTION NUMBER ONE, YOU THE NUMBERS. I DON'T REMEMBER WHAT SLIDE, BUT IT.

YEAH. THERE. SO IF ADOPTED THAT WOULD ALLOW. THIS COUNCIL TO SELECT UP TO 36 MEMBERS RIGHT.

TOTAL. SO EACH COUNCIL MEMBER WOULD BE ABLE TO SELECT UP TO FOUR. SO CURRENTLY YOU SELECT TWO. AND SO WE ARE GIVING POTENTIALLY PROPOSING TO CHANGE THAT. YOU'D BE ABLE TO SELECT UP TO FOUR STUDENTS OKAY. ALL RIGHT. SECOND POINT IS IF YOU ARE ABLE TO IF THAT LANGUAGE IS ADOPTED. AND LET'S SAY FOR 25 FOR 2425 SCHOOL YEAR, LET'S SAY YOU HAD ONE UNDERCLASSMEN AND ONE SENIOR. SO IN 25 THAT GRADUATING CLASS OF 25 WOULD INCLUDE ONE SENIOR. RIGHT? OKAY.

IN THAT CASE. IF YOU AND YOU YOU SAID YOU GAVE SOME NUMBERS AT INTRODUCTION THERE THAT. I DON'T KNOW WHETHER STUDENTS OR BY BY DISTRICT OR OR. GSD WIDE I DON'T KNOW I DON'T REMEMBER, BUT.

REFERENCE TODAY'S CALL. TODAY'S CONVERSATION OKAY, OKAY. IF YOU LET'S SAY YOU ONLY WANT TO SELECT TWO, THAT'S TOTALLY FINE. FINE. WALK ME THROUGH. RIGHT. BRIEFLY WALK ME THROUGH THAT PROCESS. YOU YOU'VE GOT AN UNDERCLASSMEN. THAT'S A ONE TO SOPHOMORE OKAY. SO YOU KNOW THEY'RE GOING TO BE A JUNIOR NEXT YEAR. SO IT'LL STILL BE IN GSD. SO OKAY. BUT THE OTHER THE OTHER THE OTHER THREE IS OKAY. BUT YOU HAVE TO CHOOSE FROM. WHAT'S YOUR CRITERIA FOR CHOOSING WHAT WHAT WOULD WHAT WOULD SPUR YOU TO SELECT AMONG THREE? I'M GOING TO USE AN EXAMPLE AMONG THE THREE AND RECOMMENDED ONE TO ME. YES. SO EACH STUDENT AND ONE THING TO NOTE IS THAT EVERY STUDENT HAS TO REAPPLY EVERY YEAR. SO IF THEY WERE A STUDENT LAST YEAR, THEY STILL HAVE TO REAPPLY FOR THIS YEAR AS A RETURNING MEMBER. AND EACH COUNCIL MEMBER IS THEN ABLE TO EITHER YOU GET A CHANCE TO CLEAR THE SLATE, YOU CAN EITHER REAPPOINT SOMEONE THAT YOU HAVE APPOINTED PREVIOUSLY, OR YOU COULD CHOOSE NOT TO REAPPOINT THAT PERSON, AND YOU CAN START OVER AND REAPPOINT UP TO FOUR PEOPLE. IF YOU POTENTIALLY DIDN'T WANT TO CHOOSE ANY OF THE STUDENTS, THAT WOULD BE YOUR RIGHT. BUT WHAT WE'RE PROPOSING RIGHT NOW IS YOU CAN CHOOSE UP TO FOUR, YOU COULD CHOOSE ONE, YOU COULD CHOOSE TWO, 3 OR 4. AND HOW YOU SELECT THE STUDENTS IS REALLY HOW YOU FEEL MOST COMFORTABLE. SOME I KNOW COUNCIL MEMBERS HAVE INTERVIEWED STUDENTS IN THE PAST, CALLED THEM ON THE PHONE OR MET WITH THEM IN PERSON. SOME MAKE THEIR SELECTIONS BASED OFF OF THE RECOMMENDATION LETTERS OR THE QUESTIONS AND ANSWERS THAT THEY RESPOND BACK TO. YOU KNOW, WE INCLUDE IN THERE WHAT THEIR GRADE IS. SO SOMETIMES COUNCIL MEMBERS MAY LOOK AT THIS STUDENT IS A FRESHMAN. AND SO MAYBE I WANT TO APPOINT A FRESHMAN BECAUSE I KNOW THEY'RE GOING TO POTENTIALLY COME BACK FOR UP TO THREE MORE YEARS VERSUS A SENIOR WHO THIS IS THEIR ONE YEAR. SO ANY FACTOR OF THOSE CRITERIA, HOWEVER, COUNCIL MEMBER CHOOSES TO PRIORITIZE THOSE IS HOW YOU COULD POTENTIALLY CHOOSE THEM IF YOU SO CHOOSE. BUT AGAIN, IF YOU DIDN'T WANT TO DO ALL FOUR, YOU WOULDN'T HAVE TO. SO IF THIS COUNCIL SEES FIT TO ADOPT THE LANGUAGE THAT YOU'RE PROPOSING. BUT BUT YOU ONLY WANTED TO SELECT FROM THE THREE. YOU GOT

[01:55:01]

ONE OVER HERE OKAY. BUT YOU ONLY WANT TO SELECT ONE FROM THIS GROUP OF THE THREE. WHAT WOULD THAT WHAT WOULD YOU WHAT CRITERIA WOULD YOU YOUR OFFICE SUBMIT TO US TO ON WHICH TO WHICH OF THOSE THREE WOULD, WOULD WHAT WOULD BE THE CRITERIA TO BASE YOUR RECOMMENDATION TO ME AS A COUNCIL MEMBER? YOU UNDERSTAND WHAT I'M SAYING? SO WE TRY TO NOT UNLESS UNLESS YOU GUYS ASK US TO. WE TRY NOT TO INSERT OUR OPINIONS ON YOUR SELECTIONS. AND SO BUT IF WE IF YOU'VE ASKED US TO PROVIDE A CHOICE TO YOU, WE WOULD RANK THEM BASED OFF OF YOUR DISTRICT.

IF THERE WERE MEMBERS IN YOUR DISTRICT, WE WOULD PRIORITIZE THOSE FIRST. AND AFTER THAT IT WOULD BE POTENTIALLY THEIR RECOMMENDATION LETTERS, THEIR THEIR ACCOMPLISHMENTS. OKAY. SO OF THOSE THREE REMAINING AND I'M I'M DONE WITH THIS. THE THREE REMAINING. YOU YOU'VE ALREADY TOLD ME ON IN PHONE CONVERSATION THAT YOU DIDN'T BASED ON BASED ON THE FILES YOU GOT. NOW THAT.

NO, THERE WERE NO STUDENTS IN DISTRICT FOUR. WHO GOES TO WHO SHOWS THAT THEY GO TO SCHOOL IN DISTRICT FOUR, RIGHT? RIGHT, RIGHT. SO THEREFORE YOU ALSO TOLD ME THAT THAT THAT THERE ARE THREE OTHER POSSIBILITIES, RIGHT? I MENTIONED THAT THERE WERE THREE STUDENTS THAT LIVED IN SAXY. RIGHT. SO THEY ARE NOT, YOU KNOW, PLUGGED INTO ANY COUNCIL MEMBERS DISTRICT. SO THEY'RE KIND OF OPEN GAME TO ANYBODY. AND THEN ANY OTHER COUNCIL MEMBERS WHO HAVE ALREADY MADE THEIR SELECTIONS, LIKE, I KNOW COUNCIL MEMBER BASS HAS MADE HIS SELECTIONS. SO ANY OTHER MEMBERS IN DISTRICT ONE THAT HAVE NOT BEEN CHOSEN WOULD BE UP FOR GRABS FOR YOU AS WELL.

SO. SO IN OTHER WORDS, MY LAST STATEMENT I KNOW IS UP. SO THERE ARE THREE FLOATING OUT THERE.

FROM SAXY AND FROM THOSE THAT ARE FLOATING OUT THERE. YOU, YOU, YOU ARE GOING TO RECOMMEND TO ME ONE OF THOSE THREE. YES. BASED ON I'M GOING TO LOOK AT THEIR RECOMMENDATION LETTERS, LOOK AT THEIR ANSWERS TO THE QUESTIONS AND DISCUSS WITH MISS MCTIER OVER HERE AS WELL. AND THEN WE'LL MAKE YOU A RECOMMENDATION. OKAY. YOU'RE GOING TO DO THAT I AM OKAY. ALL RIGHT. THANK YOU VERY MUCH. YOU'RE WELCOME. I WAS TRYING TO JUST JUST GET SOME LIFE TO THAT PROCESS THAT THAT YOU HAD ALREADY COMMITTED TO. YES, BUT I WANTED TO TALK, I WANTED TO I IT TOOK A LITTLE LONGER, BUT BUT I WANTED TO US TO TALK THROUGH THAT. OKAY. OKAY. SO THAT SO THAT FOR THE WHETHER YOU YOU DECIDE WELL IT'S, IT'S GOING TO BE ONE OR IT'S GOING TO BE TWO OR THERE'LL BE 36. I JUST WANTED YOU WANTED I JUST WANTED YOU TO BE ABLE TO TALK THROUGH THAT PROCESS OF UP ON THE FRONT END. YES. SO THAT ON THE BACK END WE WON'T HAVE THESE DISCUSSIONS.

OKAY, SO AM I. THAT MAKES SENSE. I THINK WE'RE ALL THERE. OKAY. ALL RIGHT, ALL RIGHT. THANK YOU, MAYOR. THANK YOU. MAYOR PRO TEM MOORE. THANK YOU, MR. MAYOR. JUST WANT TO CLARIFY. SO IT DOESN'T MATTER THAT THEY ARE IN SACHI OR ANY AS LONG AS THEY'RE IN GISD. YES. OKAY, GOOD.

BECAUSE I THOUGHT I, I THOUGHT I SAW SOMEWHERE WHERE IT WAS SAYING GARLAND. ONLY THE CURRENT CODE OF ORDINANCES LIMITS IT TO GARLAND THAT THEY HAVE TO LIVE IN GARLAND. WHAT WE'RE PROPOSING IS THAT WE PUT AN AND OR IN THERE THAT THEY LIVE IN GARLAND AND OR ATTEND GARLAND ISD SCHOOL THAT WAY. MAYBE THEY LIVE IN SAXY, BUT THEY ATTEND GARLAND HIGH SCHOOL NORTH, GARLAND HIGH SCHOOL SOUTH, OR ANY OF THE SCHOOLS IN GARLAND ISD THAT THEY WOULD STILL BE ABLE TO PARTICIPATE. THANK YOU, MR. MAYOR. THANK YOU, MR. BASS. THANK YOU, MAYOR TIFFANY.

RHONDA, THANK YOU FOR THE THOUGHT YOU GUYS PUT INTO THIS. I JUST I JUST WANT TO GET KIND OF A DIRECTION OF WHERE YOU GOT TO, SO I UNDERSTAND CITY OF GARLAND. AND WHAT KIND OF THOUGHT DID YOU GUYS GIVE TO OTHER SCHOOLS THAT ARE IN GARLAND, LIKE CHARTER SCHOOLS OR HARMONY? AND THEN ALSO WANT TO TALK ABOUT WHEN YOU ESPECIALLY SINCE WE'RE EXPANDING THIS PARTS OF GARLAND ARE ALSO IN RISD IN RICHARDSON. SO ARE WE REACHING OUT TO ALL OF THOSE? ARE WE FIRST, ARE WE REACHING OUT TO ALL OF THOSE SCHOOLS? AND SECOND, WHAT WAS YOUR THOUGHT

[02:00:05]

PROCESS TO LEAVE OUT THE CHARTER SCHOOLS IN GARLAND? THANK YOU. YES, I ACTUALLY KIND OF THOUGHT THAT MIGHT BE A QUESTION. AND SO THE THOUGHT ON HERE IS THE CHARTER SCHOOLS THAT ARE IN GARLAND, THEY'RE ALREADY COVERED UNDER THE LIVING IN GARLAND. THE REASON FOR CALLING OUT GARLAND ISD SCHOOL IS BECAUSE OF THE SEXY AND THE ROWLETT THAT STUDENTS LIVING IN SEXY ROWLETT.

BUT THEN TO YOUR POINT AS WELL, WE HAVE ONE STUDENT RIGHT NOW WHO LIVES IN SHE ATTENDS BERKNER. SO IT'S CROSS, SHE ATTENDS BERKNER, BUT SHE LIVES IN GARLAND. BUT THE OPPOSITE IF THEY LIVED IN RICHARDSON BUT ATTENDED GARLAND ISD SCHOOL, THAT WOULD STILL FALL UNDER WHAT WE'RE PROPOSING HERE. BUT THE IDEA IS WE'RE NOT EXCLUDING THE OTHER CHARTER SCHOOLS. OUR RECRUITING EFFORTS ARE STILL GOING TO ENCOMPASS ALL OF THOSE. THE ONLY REASON THAT WE DIDN'T MENTION THEM HERE IS BECAUSE WE'RE TRYING TO CAPTURE THE STUDENTS WHO DON'T LIVE WITHIN THE CITY OF GARLAND IN THAT. OKAY. BUT AND YOUR OUTREACH IS GOING TO BE TO YES, ISD AND THE CHARTER SCHOOLS. YES, YES, YES. AND I KNOW I NOTICED WE HAD A WE HAD A HOMESCHOOL APPLICANT AS WELL. SO THAT WAS THAT WAS REALLY COOL. LIKE TO SEE THAT. OKAY. THANK YOU. I REALLY APPRECIATE THE WORK YOU PUT INTO THIS. VERY GOOD. COUNCIL MEMBER THOMAS. THANK YOU LADIES FOR COMING DOWN TONIGHT. AND THANK YOU, TIFFANY I, I REPLIED TO TIFFANY'S EMAIL AFTER READING THE RECOMMENDATION LETTERS ABOUT. I HAD NO IDEA THIS JOB WAS GOING TO GET THIS DIFFICULT THIS FAST. OF THE QUALIFICATIONS OF THE APPLICANTS THAT I GOT IN DISTRICT SEVEN JUST BLEW ME AWAY. SO I, I REALLY THANK YOU FOR RECRUITING SOME REALLY FINE INDIVIDUALS. AND SO I WANT TO FIRST SAY THANK YOU FOR THAT. SECONDLY, I'M CURIOUS AS TO HOW YOU ARRIVED AT THE NUMBER 36. IF YOU HAD HAD 50 APPLICANTS, WOULD YOU GO TO 45? IF YOU'D HAD 100, WOULD YOU WANT ANOTHER NUMBER? HOW DO WE GET TO 36? WE GOT TO 36 BECAUSE RHONDA AND I TALKED ABOUT WHAT WE THOUGHT OUR THRESHOLD WAS THAT BECAUSE WE ACTUALLY DID TO BE TRANSPARENT, WE HAD ABOUT 46 PEOPLE APPLY ON THE FRONT END, SUBMIT AN APPLICATION, BUT THEY DIDN'T SUBMIT ALL OF THE QUALIFYING PIECES. SO WE HAD TO KICK OUT A FEW SAYING WE GAVE THEM SOME EXTRA TIME AND THEY STILL WEREN'T ABLE TO SUBMIT ALL THE QUALIFYING PIECES. SO WE HAD TO KICK THOSE OUT. AND RHONDA AND I TALKED ABOUT WHAT IS OUR NUMBER, COULD WE GO UP TO 45? AND WE DIDN'T THINK WE COULD HANDLE THAT. WE THOUGHT THAT WE COULD STICK TO 36 AND THAT'S HOW WE CAME UP. SO THAT'S KIND OF OPTIMAL CLASS SIZE. IF YOU'RE A PUBLIC SCHOOL CLASS, YOU WOULDN'T WANT TO BE BIGGER THAN THAT. AND THAT'S KIND OF HOW YOU GOT TO THAT NUMBER. SO THAT DOES MAKE MY LIFE MUCH EASIER BECAUSE THE THOUGHT WAS WHAT COULD IF WE CAN'T HAVE TWO PEOPLE AT EVERYTHING, WHAT COULD ONE PERSON HANDLE? AND WE DIDN'T THINK, YOU KNOW, A GREATER THAN 36 TO 1 RATIO WAS WAS A GOOD IDEA. OKAY. VERY GOOD. THANK YOU. THANK YOU MAYOR. THANK YOU. ANY ADDITIONAL QUESTIONS ON THIS ITEM. AND THIS WILL BE UP FOR FORMAL CONSIDERATION TOMORROW NIGHT. THANK YOU BOTH VERY MUCH.

[10. Legislative and Public Affairs Committee Report Councilmember BJ Williams, Chair of the Legislative & Public Affairs Committee, and staff will provide a committee report. Ariel Traub, Managing Director of Legislative & Public Affairs, will discuss key takeaways from the 89th legislative session.]

MOVING ON TO ITEM TEN, LEGISLATIVE AND PUBLIC AFFAIRS COMMITTEE REPORT. COUNSELOR WILLIAMS HAS STEPPED OUT, BUT WE WILL CONTINUE ON. AERIAL. GOOD EVENING. GOOD EVENING. SEE YOU JUST WALKED UP AND JUST PULLED YOUR PRESENTATION UP JUST LIKE THAT. ALL THESE OTHER FOLKS HAVE JUST STRUGGLED ALL NIGHT. YEAH. YOU KNOW, WHAT DO YOU GOT FOR US? WELL, YOU MAY KNOW THIS, BUT SESSION IS DONE. THANK YOU, THANK YOU. WE'RE ALSO EQUALLY HAPPY. WE DID A LOT THIS SESSION. WE GOT A LOT ACCOMPLISHED. WE WORKED WITH A LOT OF EXTERNAL FOLKS. WE WORKED WITH A LOT OF OUR OUR PARTNER CITIES. WE WORKED WITH A LOT OF OUR DEPARTMENTS AND WITH YOU ALL. SO WE HAD A REALLY GOOD TIME. WE ACTIVELY ENGAGED ON OVER 100 BILLS. WE BREAK IT DOWN A LITTLE BIT FURTHER. WE SUBMITTED LETTERS OF OPPOSITION OR SUPPORT ON OVER 40 BILLS WE REGISTERED FOR OR AGAINST OVER 50 BILLS. WE PROPOSED AMENDMENT LANGUAGE TO HELP MITIGATE BILL IMPACTS TO THE CITY OF GARLAND. WE PROPOSED QUESTIONS TO OUR OUR HOUSE DELEGATION AND SENATE DELEGATION, AND WE PROVIDED SOME SOME POINT OF ORDER DRAFTS ON A FEW BILLS AS WELL FOR CONSIDERATION THROUGHOUT SESSION. WE TRIED TO MAKE SURE YOU ALL WERE AS INFORMED AS POSSIBLE. WE SENT OUT THE WEEKLY TALES OF THE ALLEGED NEWSLETTER. WE PROVIDED BILL TRACKING

[02:05:06]

SUMMARIES, IMPACT MEMOS. WE ALSO COORDINATED WITH MANY OF OUR EXTERNAL PARTNERS SUCH AS HTML, TPA, NORTH TEXAS MUNICIPAL WATER DISTRICT, NORTH TEXAS COMMISSION, AND ALL OF OUR LEGISLATIVE OFFICES. AND THEN WE FOLLOWED THE BILL FROM FILING TO DEATH OR TO PASSAGE. SO THAT INCLUDED EVERYTHING IN BETWEEN AMENDMENTS, SUBSTITUTE LANGUAGE, ETC. I WANTED TO CLOSE THE LOOP ON SEVERAL OF THE BILLS THAT WE HAVE DISCUSSED THROUGHOUT SESSION. SO I'LL DO THAT OVER THE NEXT COUPLE OF SLIDES. HOUSE BILL 19 WAS THE TAXPAYER FUNDED LOBBY BILL. THAT ONE DIED DURING DURING THE CALENDAR DEADLINE, SENATE BILL 412 SLASH HOUSE BILL 267 WAS SIGNED BY THE GOVERNOR, AND THAT WAS THE ONE THAT REMOVED THE AFFIRMATIVE DEFENSE FOR LIBRARY EMPLOYEES AND YOUTH PROGRAM STAFF. SO POTENTIALLY THOSE STAFF COULD BE SUED BY THE PUBLIC, NOT AS AN EMPLOYEE, BUT AS AS AN INDIVIDUAL. SENATE BILL SIX WAS ONE OF THE LARGE ELECTRIC BILLS THAT WE WORKED EXTREMELY CLOSELY ON. TAYLOR WORKED A LOT ON THIS BILL. THAT ONE WAS SENT TO THE GOVERNOR.

SENATE BILL 15. THAT IS THE LOT DENSITY BILL. WE WORKED A LOT ON THIS BILL. WE'VE WE HAD AN AMENDMENT THAT WAS THAT WAS ON IN IN THE HOUSE. IT WAS STRIPPED OUT IN CONFERENCE. SO THERE WERE A COUPLE OF PROVISIONS THAT MADE IT A LITTLE BIT BETTER. BUT I CAN ANSWER ANY QUESTIONS YOU ALL MAY HAVE ON THAT ONE. AND THEN SENATE BILL 673 REGARDING OUR ABILITY TO REGULATE ADUS ALSO DIED. SENATE BILL 840 IS ONE THAT I'M SURE YOU ALL HAVE HEARD OF. WE'VE DISCUSSED THIS ONE A FEW TIMES AS WELL, BUT ESSENTIALLY THE BILL ALLOWS THE REDEVELOPMENT OF MULTI REDEVELOPMENT OF COMMERCIAL AND RETAIL USE TO MULTIFAMILY OR MIXED USE. THAT ONE IS SENT TO THE GOVERNOR. THE TWO PREEMPTION BILLS DIED. THOSE THOSE ARE DEAD. THE MUNICIPAL FINANCE BILL, SENATE BILL 1024, WHICH WOULD HAVE REALLY RESTRICTED OUR ABILITY TO ISSUE COS OR ANTICIPATION NOTES, IS THAT ONE DIED AS WELL. HOUSE BILL 23 WAS THE THIRD PARTY INSPECTIONS BILL THAT WE WORKED CLOSELY WITH THE AUTHOR ON. THAT ONE DIED AS WELL. BUT HOUSE BILL 24, WHICH IS ONE OF THE ZONE CHANGES, THAT ONE WAS SENT TO THE GOVERNOR. FINALLY, THE DART RESTRUCTURE FINANCE RESTRUCTURE BILL DIED. THAT WAS HOUSE BILL 3187, SENATE BILL 718 ALSO DIED. THAT WAS ONE OF THE ELECTRIC BILLS WE HAD BEEN FOLLOWING CLOSELY, AS WAS SENATE BILL 393. AND HOUSE BILL 1227 WAS ANOTHER ONE THAT WE FOLLOWED CLOSELY RELATING TO FRANCHISE FEES. AND HOUSE BILL 21 RELATES TO HOUSING FINANCE CORPORATIONS, AND THAT ONE WAS PASSED. WE WERE NOT ABLE TO GET IT RETROACTIVE, BUT MOVING FORWARD, HOUSING FINANCE CORPORATIONS ARE FORCED TO STAY WITHIN THEIR SPECIFIC BOUNDARY. WE HAD TWO LEGISLATIVE INITIATIVES THIS SESSION. ONE WAS ALCOHOLIC BEVERAGE ZONES. THE OTHER WAS A QUALIFIED HOTEL PROJECT. SO ON THE ALCOHOLIC BEVERAGE ZONE FRONT, WE WORKED WITH REPRESENTATIVE RHETTA BOWERS AND SENATOR NATHAN JOHNSON TO FILE THEIR RESPECTIVE BILL, SENATE BILL 2633 AND HOUSE BILL 3085. WE WERE ABLE TO SEE QUITE A BIT OF MOVEMENT ON SENATE BILL 2633. HOWEVER, IT FACED SOME OPPOSITION AND DIED IN THE HOUSE, AND WE WEREN'T ABLE TO GET THE HOUSE BILL TO MOVE ON THE QUALIFIED HOTEL PROJECT BILL. WE WERE, HOWEVER, ABLE TO GET IT THROUGH THE COMMITTEE IN BOTH THE HOUSE AND THE SENATE. THOSE ARE THEN COMBINED INTO ONE OMNIBUS BILL, AND THAT BILL ALSO DIED. SO WE HAD WORKED EXTREMELY CLOSELY WITH THE AUTHOR. THERE WERE ABOUT 30 CITIES THAT WERE WRAPPED UP INTO THIS BILL. THE SENATE PASSED A DIFFERENT VERSION. THEY INCLUDED SOME LANGUAGE THAT LIMITED EACH PROJECT OR EACH CITY TO ONE PROJECT, THAT THEY COULD DRAW DOWN. SOME OF THOSE STATE FUNDS FOR THE HOUSE DID NOT LOVE THAT LANGUAGE, AND THERE WAS SOME CONSIDERATION FROM AN EXTERNAL STAKEHOLDER TO KILL THE CONFERENCE COMMITTEE REPORT. SO IT JUST NEVER CAME OUT OF CONFERENCE KILLING THE BILL FOR ALL CITIES. AND THEN ONCE OUR ALCOHOLIC BEVERAGE ZONE BILLS DIED, WE WENT BACK TO THE DRAWING BOARD AND WE WORKED CLOSELY WITH REPRESENTATIVE RHETTA BOWERS TO AND SHE HELPED US WORK WITH REPRESENTATIVE

[02:10:02]

GERTIE'S OFFICE, AND WE WERE ABLE TO GET HIS APPROVAL TO ADD OUR OUR BILL, SENATE BILL 2633, ONTO HIS HOUSE BILL ON THE SENATE FLOOR. SO WE THEN WORKED WITH SENATOR NATHAN JOHNSON AND SENATOR SCHWERTNER TO GET OUR LANGUAGE ON. IT WAS EFFECTIVELY ADDED ONTO THE SENATE ON THE FLOOR. THERE WAS A STAKEHOLDER WHO DID NOT LOVE THAT, SO IT WENT TO CONFERENCE IN THE HOUSE WHERE WE NEGOTIATED WITH THAT STAKEHOLDER AND REPRESENTATIVE GERTIE'S STAFF, AND WE WERE ABLE TO COME TO A COMPROMISE TO NOT ALLOW US TO HAVE PACKAGE STORES, BUT INSTEAD TO ALLOW ESSENTIALLY BARS IN THE CITY OF GARLAND. SO THAT ONE IS WITH THE GOVERNOR NOW AWAITING SIGNATURE OR LACK OF SIGNATURE TO JUST GO THROUGH. HOPEFULLY NOT A VETO. ARE THERE ANY QUESTIONS SO FAR? QUEUE IS CLEAR. SEE, FINALLY, I WANTED TO PROVIDE AN UPDATE ON ON DART SINCE THERE WERE QUITE A FEW BILLS FILED, THR OF WHICH DO THE SAME THING. HOUSE BILL 3087, SENATE BILL 1557, AND SENATE BILL 3075 ALL CREATED THE GENERAL MOBILITY PROGRAM, RESTRICTED DARTS TO THEIR PLEDGE OF 75% OF REVENUE, OR THREE QUARTERS, AND THEN RESTRICTED THEM FROM ISSUING FURTHER DEBT TO THE CITY WISH TO PULL OUT. AND THEN THERE WAS SENATE BILL 2118 BY SENATOR PARKER THAT WAS FILED, THAT KIND OF RESTRUCTURED THE DART BOARD AND THE MAKEUP AND VOTING POWER AS WELL. THAT ONE DID NOT SEE A HEARING, BUT HOUSE BILL 3001 87 DID. IT JUST DIDN'T IT DIDN'T PASS THROUGH IN TIME. SO IN RESPONSE TO THOSE BILLS BEING FILED, DART CAME TO THE CAME TO THE NEGOTIATION TABLE. AND THE GENERAL MOBILITY PROGRAM ON THE DARK SIDE WAS WAS BORN. AND WHAT THAT DOES IS IT ESTABLISHES A PROGRAM THAT WOULD REDISTRIBUTE 5% OF THE AGENCY'S ANNUAL SALES TAX REVENUE AMONG THE SEVEN ELIGIBLE MEMBER CITIES FOR A TWO YEAR PERIOD. THOSE CITIES ARE ADDISON, CARROLLTON-FARMERS BRANCH, HIGHLAND PARK, RICHARDSON, PLANO, AND UNIVERSITY PARK. THE CONCERN WAS THAT THIS THIS PROGRAM KIND OF MADE WINNERS AND LOSERS IN THIS SITUATION.

WHEREAS THE LEGISLATION CREATED AN EVENING, AN EVEN BOARD ACROSS ALL MEMBER CITIES. AS THE BILL DEADLINES APPROACHED IN THE DART BILLS ULTIMATELY FAILED. THERE WAS SOME CONCERN THAT WITHOUT THE PRESSURE OF LEGISLATION, THAT MAYBE THE GMP PROGRAM ON THE DART SIDE WOULDN'T SEE THE LIGHT OF D. AS THE LEGISLATURE ADJOURNED, HOWEVER, DART RELEASED A STATEMENT THAT IN PREPARATION FOR THE IMPLEMENTATION OF THEIR GMP, THAT THEY WOULD BE MAKING HISTORIC CUTS AND AS SUCH THEY WILL BE HOLDING PUBLIC HEARINGS. OUR PRE PUBLIC HEARING FOR THE COMMUNITY WILL TAKE PLACE ON THURSDAY, JUNE 26TH FROM 630 TO 730. AND THEN THIS IS THEIR LIST OF PROPOSED CUTS THAT WILL BE DISCUSSED AT THAT COMMUNITY MEETING. AND NUMBER ONE, THERE IS A BOLD BULLET POINT AND THAT IS OUR BUS ROUTE THAT IS FACING THE CHOPPING BLOCK. THAT'S THE LAKE RAY HUBBARD EXPRESS. AND THEN THEY THERE'S GOING TO BE FREQUENCY REDUCTIONS ON ON ALL MODES OF TRANSPORTATION. SOME PARATRANSIT CHANGES AND A LOT OF FARE INCREASES AND CHANGES ACROSS THE BOARD. I THINK ONE OF THE CONCERNING OR CONFUSING ASPECTS OF THIS PROPOSAL IS THAT THEIR LARGEST CONCERN WITH THE LEGISLATION THAT WAS PROPOSED WAS THAT THEY WOULD HAVE TO INSTITUTE HISTORIC CUTS. AND HERE WE ARE FACING HISTORIC CUTS ANYWAYS. SO THAT THAT MEETING IS SET TO HAPPEN IN IN ABOUT TWO WEEKS. ARE THERE ANY QUESTIONS? VERY GOOD, COUNCILOR WILLIAMS. EXCELLT REPORT. THANK YOU TO YOU. AND I DON'T SEE YOU. OH, THERE SHE IS. THERE SHE IS.

YEAH. MY PARTNER IN CRIME. I JUST WANT I WANT TO SAY TO YOU THAT. YOU YOU'VE AFFORDED TO US.

WHAT THE. THE BACKROOM DEALS AN. BUT YOU DID AN EXCELLENT JOB, BOTH OF YOU. AND LAYING IT OUT AND CHEERLEADING. WHO THE WINNERS ARE AND WHO LOSES IT ALL. THANK YOU. POTENTIALLY. SO

[02:15:09]

THE 26. WE DON'T KNOW YET HOW. SINCE IT'S DARTS MEETING THEY'RE GOING TO HOLD IT. WE UNDERSTAND CITY HALL. WE DON'T KNOW IT YET BUT BUT WHAT WHAT ONE IF IT'S IN OUR CITY, WE'LL SURVIVE IT. BUT WHAT I WANT YOU TO KNOW AND YOUR YOUR PARTNER IN CRIME THAT YOU'VE DONE. AN OUTSTANDING JOB NOTWITHSTANDING THE PSONAL TRAUMA THAT YOU EXPERIENCED. BUT YOU DIDN'T LET THAT DETER YOU.

SO I WANT YOU TO KNOW FROM, FROM AS CHAIR OF THE COMMITTEE AND AS AS WHO REPRESENTS THE MAYOR AND CITY MANAGER AND THE REST OF COUNCIL. I WANT YOU TO KNOW HOW MUCH I APPRECIATE YOU AND MAKING THIS REPORT. THANK YOU, THANK YOU, THANK YOU, THANK YOU, THANK YOU, COUNCILOR DUTTON, I JUST WANT TO SAY THAT YOUR LEDGE, A NEWSLETTER, WAS PHENOMENAL AND A HUGE HELP TO ALL OF US. I FEEL THINGS DUMBED DOWN A LITTLE. AND YOU GUYS DEFINITELY HELPED MAKE THAT POSSIBLE. SO I, I DEFINITELY APPRECIATE APPRECIATE THE NEWSLETTER. IT WAS A TREMENDOUS HELP TO ME PERSONALLY. YOU GUYS YOU GUYS ROCKED IT FOR SURE. THANK YOU. THANKS FOR ALL OF YOUR HARD WORK DOWN THERE BECAUSE I KNOW IT WAS NOT EASY. AND COUNCIL, I HOPE THAT WE ALL TAKE A MOMENT JUST TO REALIZE THAT WE'RE WAITING AND SEEING WHAT'S GOING TO HAPPEN DOESN'T ALWAYS WORK OUT.

SO I HOPE THAT GOING FORWARD THAT WE TAKE TAKE A MOMENT TO HAVE A LITTLE BACKBONE AND STAND UP FOR STUFF, BECAUSE THIS SITUATION IS NOT WE JUST HAD A WHOLE MEETING ABOUT ADA STUFF, AND THIS IS NOT GOING TO BE GOOD FOR ADA PEOPLE. SO THANK YOU GUYS. THANK YOU. DEPUTY MAYOR PRO TEM, I HAVE THE SAME COMMENT ABOUT TALES FROM THE LEDGE. IT WAS AWESOME AND I FELT MORE INFORMED THIS LEGISLATIVE SESSION THAN I EVER HAVE ON COUNCIL. SO YOU'VE DONE A FANTASTIC JOB. I HAVE ATTENDED SEVERAL LEGISLATIVE AFFAIRS COMMITTEE MEETINGS, EVEN THOUGH I'M NOT ON THAT COMMITTEE, BECAUSE YOU'VE JUST MADE IT SO ENJOYABLE, ACTUALLY, BECAUSE ALL OF THAT STUFF CAN BE QUITE TRAUMATIZING SOMETIMES. SO, SO THANK YOU SO MUCH, AND I REALLY APPRECIATE THE JOB THAT YOU'RE DOING. THANK YOU. I LOVE DOING IT. SO I APPRECIATE THE OPPORTUNITY TO CONTINUE TO DO SO. THANK YOU. THANK YOU MAYOR. THANK YOU. ANY ADDITIONAL QUESTIONS? SEEING NONE. THANK YOU. THAT WAS THE LAST ITEM UNDER THIS SECTION. NEXT UP IS

[11. Councilmember Kris Beard • Kay Moore, Parks & Recreation Advisory Board]

ITEM 11. CONSIDER APPOINTMENTS TO BOARDS AND COMMISSIONS. AND TOMORROW NIGHT COUNCIL MEMBER BEARD HAS AN APPOINTMENT FOR PARKS AND REC. AND MOVING ON TO FUTURE AGENDA ITEMS. IS THERE

[ANNOUNCE FUTURE AGENDA ITEMS A Councilmember, with a second by another member or the Mayor alone, may ask that an item be placed on a future agenda of the City Council or of a committee of the City Council. No substantive discussion of that item will take place at this time.]

ANYONE WHO HAS ANY FUTURE AGENDA ITEMS TO BRING FORWARD THIS EVENING? DEPUTY MAYOR PRO TEM YES, I WOULD LIKE THE LIBRARY DEPARTMENT TO UPDATE US REGARDING THE KIOSKS AND I WOULD LIKE A SHORT PRESENTATION OR HOWEVER LONG THEY WANT TO MAKE IT. ACTUALLY, REGARDING ONE BOOK, ONE GARLAND. OKAY. AND WE WILL SCHEDULE THAT FOR AN UPCOMING WORK SESSION. THANK YOU. ARE THERE ANY ADDITIONAL FUTURE AGENDA ITEMS THIS EVENING? COUNCIL MEMBER ART.

WELL, I'D LIKE TO HAVE A BRIEFING ON. LET'S SEE HERE. I WROTE IT DOWN. YOU JUST SEARCHING FOR A TOPIC? NO NO NO NO, THIS WAS ABOUT THIS IS ABOUT OUR RETICULATED PYTHON. I WAS WONDERING IF WE COULD HAVE A BRIEFING ON THE LEGALITIES OF HAVING EXOTIC PETS IN THE CITY OF GARLAND. SURE. I BELIEVE I BELIEVE THE CITY ATTORNEY'S OFFICE CAN CAN WORK SOMETHING UP ON THAT. ALL RIGHT. FOR A FUTURE WORK SESSION. THERE HAVE BEEN MULTIPLE ALONG THE. YEAH, YEAH.

YES, YES. MR. SNAKE, WOULD YOU LIKE. ALRIGHT. ANY ADDITIONAL. NOPE. THAT'S IT. ALL RIGHT.

OBVIOUSLY THERE'S A PROCESS. YOU KNOW, IF SOMETHING COMES UP AFTER THIS EVENING MOVING ON TO

[EXECUTIVE SESSION]

[02:20:03]

EXECUTIVE SESSION, THE COUNCIL WILL ADJOURN INTO EXECUTIVE SESSION PURSUANT TO SECTIONS FIVE FIVE, 1.07155, 1.07255, 1.086 AND 552.133 OF THE TEXAS GOVERNMENT CODE TO DELIBERATE AND DISCUSS THE FOLLOWING DELIBERATE DELIBERATION OF THE PURCHASE, EXCHANGE, LEASE OR VALUE OF REAL PROPERTY IN THE AREA OF PRESIDENT GEORGE BUSH TURNPIKE AND HOLFORD ROAD, WHERE DELIBERATION IN AN OPEN MEETING WOULD HAVE DETRIMENTAL EFFECT ON THE POSITION OF THE GOVERNMENTAL BODY IN NEGOTIATIONS WITH A THIRD PERSON AND ATTORNEY. CLIENT COMMUNICATIONS RELATED TO THE SAME AND ITEM 13, AND THAT IS, COMPETITIVE MATTERS RELATING TO GARLAND POWER AND LIGHT AS IT PERTAINS TO RISK MANAGEMENT INFORMATION, CUSTOMER BILLING, CONTRACT AND USAGE INFORMATION, ELECTRIC POWER PRICING INFORMATION AND SYSTEM LOAD CHARACTERISTICS, AND ATTORNEY CLIENT COMMUNICATIONS REGARDING THE SAME. AND WE WILL TAKE A SHORT RECESS. LET'S HAVE EVERYONE BACK AT